Site 144 Trash Capture Project

Open State & local contract opportunity Posted

Solicitation number
B26141324018
State
California
Responses due

Opportunity facts

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Sacramento is soliciting bids for construction of a full trash capture system at Site 144 near Interstate 80 North Ditch, approximately 170 feet east of the intersection of Phillipi Way and Rio Linda Boulevard, with proposals due October 21, 2026.

The project implements Central Valley Regional Water Board requirements to prevent discharge of trash greater than five millimeters into receiving waters. The scope includes installation of a Water Board certified, manufacturer-prefabricated trash capture system located offline from the drainage channel, a mechanically operated weir system in the channel, concrete structure installation, asphalt concrete paving, earthwork, and associated improvements.

Performance occurs within the greater Sacramento area watershed. No estimated contract value, contract term, set-asides, preferences, evaluation criteria, pre-bid meeting or site visit date, question deadline, or incumbent information is identified in the source.

Opportunity text

Scope of Services: The City of Sacramento (City) is proposing to construct full trash capture systems as part of the Trash Full Capture Project within the greater Sacramento area to comply with the Central Valley Regional Water Boards (Water Board) requirements to prevent the discharge of trash greater than five millimeters (5mm) into receiving waters through the implementation of certified Full Capture Systems. This project intends to provide full trash capture within the designated watershed, Site 144 at the Interstate 80 (I-80) North Ditch approximately 170 feet east of the intersection of Phillipi Way and Rio Linda Boulevard. This project includes the installation of a Water Board certified, manufacturer-prefabricated trash capture system located offline from the I-80 North Ditch, along with a mechanically operated weir system in the drainage channel. Among the construction components include concrete structures installation, asphalt concrete paving, earthwork, and associated improvements.

Files

File Type Posted
Bid Notice-Site 144 Trash Capture Project.pdf PDF