Sidewalk Repair Program - Package No. 79: CTIEP
Closed State & local contract opportunity Posted
- Solicitation number
- E1909517
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- David Nguyen david.nguyen@lacity.org (213) 847-1922
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Los Angeles, Department of Public Works, Bureau of Engineering is requesting bids on the Sidewalk Repair Program — Package No. 79 (CTIEP), a Design-Bid-Build construction project to remediate pedestrian facilities at 160 Access Request sites and bring them into ADA compliance, with bids due July 22, 2026 at 10:00 a.m. and a mandatory pre-bid meeting on June 25, 2026 at 10:00 a.m. via Google Meet. The City imposes apprenticeship, prevailing wage, and Iran Contracting Act compliance requirements; holds a Local Business Preference Program providing up to 10 percent bid reduction for Local Business Enterprises or City Business Enterprises; and mandates Business Inclusion Program outreach documentation on the City's RAMP portal by 4:30 p.m. on the day following bid opening.
Bidders must hold a valid California Contractor's License Classification "A" and be registered with the California Department of Industrial Relations. The scope spans 39 line items including sidewalk, driveway, curb and gutter, and alley replacement; asphalt concrete and intersection gutter repairs; tree removal, planting, canopy trimming, and root pruning; landscape restoration; and adjustment of water meters and utility boxes. Bid Item No. 70 is a fixed-cost allowance for removal and adjustment of unknown substructures and utilities set at $100,000. The project requires Buy Clean California Act compliance with facility-specific Environmental Product Declarations for eligible materials.
Subcontracting minimums are 25 percent of total bid amount (excluding fixed-cost items), with anticipated participation targets of 4 percent MBE, 2 percent WBE, 25 percent SBE, 8 percent EBE, and 3 percent DVBE. The contractor must perform at least 50 percent of the contract price with its own organization. Project completion time is 260 calendar days with liquidated damages of $1,000 per day. Written technical questions are due July 1, 2026 to David Nguyen at the Sidewalk Compliance Division.
Opportunity text
This project is a Design-Bid-Build construction project to remediate existing pedestrian facilities and bring them into compliance with current Americans with Disabilities Act (ADA) standards at 160 Access Request sites The work includes sidewalk, driveway, curb and gutter, and alley replacement; asphalt concrete and intersection gutter repairs; tree removal, planting, canopy trimming, and root pruning; landscape restoration; and adjustment of water meters; and adjustment of utility boxes and vaults to finished grade.
Files
| File | Type | Posted |
|---|---|---|
| Sidewalk Repair Program - Package No. 79 CTIEP.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity