Shreveport Fire Department Training Tower Demolition

Closed State & local contract opportunity Posted

Solicitation number
26-514
State
Louisiana
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Shreveport, Louisiana is requesting quotes for complete demolition of the Shreveport Fire Department Training Tower at the Police & Fire Academy under RFQ #26-514, with quotes due June 18, 2026.

The scope encompasses demolition of a 7-story concrete and brick structure used for fire rescue training; removal of all debris from the site; demolition of a 64-foot by 40-foot concrete paving area surrounding the tower; and site preparation including fill-material placement, compaction, and grading for positive drainage. All demolition must comply with ANSI/ASSE A10.6 and NFPA 241 standards. Work is restricted to 7:00 a.m. to 6:00 p.m., Monday through Friday, and must be coordinated with Fire Department personnel to avoid interference with facility operations.

Contractors must conduct a visual survey for hazardous materials prior to work commencement. Utilities must be disconnected and capped at least 24 inches below grade before demolition begins. Refrigerant must be removed from mechanical equipment per 40 CFR 82. All demolition waste becomes contractor property and must be disposed of at EPA-approved construction and demolition waste landfills. No explosives are permitted.

Contractors are responsible for temporary facilities, security, erosion and sedimentation controls, and fire-safety programs compliant with NFPA 241 and EPA Construction General Permit requirements. Payment is structured on an AIA Document G703 schedule of values with applications submitted in three signed and notarized copies. Final completion requires documented punch lists, warranty submissions in three-ring binders, and final cleaning to restore the site and adjacent areas to original condition. Russell G. DeLancy, AIA, serves as City Architect and project representative.

Opportunity text

The Work of Project is defined by the Contract Documents and consists of the following: The Shreveport Fire Department Training Tower is located at the Police & Fire Academy, 6440 Greenwood Road, Shreveport, LA 71119. The Training Tower is a 7 story, concrete and brick structure used for various fire rescue training activities. The scope of this project is the complete demolition of the Training Tower and removal of all debris from the project site. In addition to the building demolition, a 64-0 long by 40-0 wide area of concrete paving around the Training Tower is to be demolished and removed from the project site. Select fill material is to be brought in to the 64-0 x 40-0 area of open ground, compacted, and graded for positive drainage.

Files

File Type Posted
Project Manual (10).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity