Sanitary Sewer Phase 106 Rehabilitation
Closed State & local contract opportunity Posted
- Solicitation number
- 24170-125-10114-000
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Brianna Reyes bnreyes@lan-inc.com (713) 997-2520
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Harris County, Texas is soliciting bids for Sanitary Sewer Phase 106 Rehabilitation with proposals due September 29, 2026. The scope spans comprehensive sanitary sewer-line rehabilitation using multiple methods: pre- and post-television inspection, point repair, service repair, combination repair, pipe bursting with service reconnections, cured-in-place pipe (CIPP) installation, and mechanical cleaning. Work includes raising of manholes to one inch above existing natural ground as directed by the Engineer; rerouting sanitary sewer service lines within easements and around obstructions per Engineer direction; trench safety per Section 01561; implementation, maintenance, and removal of traffic control; and complete site restoration including removal and replacement of damaged pavement, subgrade, curb and gutter, pavement markings, sidewalks, driveways, concrete patios, pools, wooden decks, irrigation lines, turf, plants, shrubs, fences, trees, and damaged traffic signaling equipment within the easement or right of way. The contractor is responsible for obtaining all permits required for street cuts and traffic control, ensuring traffic control is executed as necessary to facilitate work (noting that plans may not include all necessary traffic control details), and managing any bypass pumping required to complete the work. All work is subject to Engineer direction on rehabilitation methods and service-line rerouting decisions. No contract value, contract term, set-asides, preferences, evaluation criteria, or pre-bid meeting date are specified in the source material.
Opportunity text
In general, this work consists of: 1. Pre-television of lines to be repaired by point repair, service repair, combination point repair, service line reconnection, and/or cured-in-place pipe. 2. Raising of manholes to 1 inch above existing natural ground, as directed by Engineer. 3. Pipe bursting of sanitary lines including service reconnections in kind, remove and replace external drop stack removal and replacements, and cleanout replacements. 4. Rehabilitation of sanitary sewer lines by point repair, service repair, combination repair (including drop stack replacement), and mechanical cleaning. 5. Rehabilitation of sanitary sewer lines using the Cured-In-Place-Pipe (CIPP) method including external service reconnections in kind. 6. Rerouting sanitary sewer service lines as needed within the easement to reconnect existing services. All rerouted sanitary sewer service lines must be directed by the Engineer and may include situations such as service lines crossing outside the easement or routing service lines around various obstructions. 7. Television inspection of sewer lines after completion of rehabilitation work. 8. Trench safety as required per Section 01561, throughout the project. 9. Implementation, maintenance, and removal of traffic control when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. Contractor is responsible for obtaining any and all permits required for street cuts and/or traffic control. 10. Site restoration including removal and replacement of damaged pavement including subgrade, curb and gutter, pavement markings as necessary and sidewalks, driveways, concrete patios, pools, wooden decks, irrigation lines, turf, plants, shrubs, fences, trees, damaged traffic signaling equipment and other miscellaneous items in the easement or right of way. 11. Any bypass pumping required to complete the work is incidental to the project. 12. Coordinating with District Operations Staff and Engineer to reduce and maintain flow from lift stations into sanitary sewer manholes in order for rehabilitation work to be performed.
Files
| File | Type | Posted |
|---|---|---|
| Sanitary Sewer Phase 106 Rehabilitation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity