San Luis Rey Park Restroom Rehabilitation

Closed State & local contract opportunity Posted

Solicitation number
14811
State
California
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

A California county or municipality is soliciting bids for restroom building rehabilitation at San Luis Rey Park, with proposals due October 20, 2026. The source does not identify the specific issuing body, and no contract value, set-asides, incumbent contractor, or evaluation criteria are stated.

The scope encompasses demolition and comprehensive reconstruction to meet accessibility and current building code standards. Exterior work includes retrofitting parking spaces for ADA compliance, new concrete walkways, metal fencing with screen panels and gates, metal wall louvers, CMU wall infills, pressure washing, painting, new plumbing fixtures, and LED lighting. Interior work reconfigures the restroom facility with new concrete slab, CMU walls for private toilet rooms, metal screen panels, wood-framed walls and doors with compliant hardware, epoxy flooring with integrated cove base finish, painted walls and ceilings, toilet accessories and signage, plumbing fixtures, and LED lighting. No detailed specifications, place of performance beyond the park name, contract term, or procurement timeline beyond the October 20 due date are provided in the available materials.

Opportunity text

The work to be performed involves demolition in preparation for new improvements to existing restroom building, which includes: a. Exterior Work: Retrofit existing parking spaces for compliance to provide an accessible car and van Parking spaces and new compliant concrete walk. New metal fence, metal screen panels, and metal gates. b. Exterior of Building: New metal wall louvers, new wall infills with matching CMU, pressure wash and painting of existing exterior of building, new plumbing fixtures such as lavatories to meet accessible requirements, and new LED lighting. c. Interior of Building: Improvements include to Restroom reconfiguration for compliance with accessible standards providing/replacing new interior concrete slab, CMU walls to provide private toilet rooms, metal screen panels, wood framings of walls, doors, door frame with compliant door hardware, new epoxy floor finish with integrated cove base finish and wall & ceiling paint finishes, toilet accessories, and wall & door signages, plumbing fixtures, LED light fixtures.

Files

File Type Posted
San Luis Rey Park Restroom Rehabilitation.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity