Salcedo Lift Station Rehabilitation Project
Closed State & local contract opportunity Posted
- Solicitation number
- 26-0078-3
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Felix Espada Jr. fespada@chathamcounty.org (912) 790-1624
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Chatham County is requesting bids for rehabilitation of the Salcedo Lift Station, a duplex submersible pump station at 2505 Salcedo Ave, Savannah, Georgia, under ITB Reference 26-0078-3, with bids due August 11, 2026 at 2:00 p.m. EDT and a pre-bid conference on July 21, 2026 from 2:00 p.m. to 2:30 p.m. EDT.
The scope includes removal and replacement of existing pumps with new pumps and associated piping, fittings, and valves; pigging of the existing force main; construction of a new discharge valve vault; and installation of auxiliary equipment including a permanent bypass pump, electrical components, and SCADA systems. Detailed technical specifications and plans are provided in the solicitation portal.
A bid bond equal to 5% of the total bid amount is required at submission. Upon award, the successful bidder must provide Payment and Performance Bonds each equal to 100% of the bid amount. Questions are due by August 4, 2026 at 5:00 p.m. EDT. All questions must be directed to Felix Espada Jr. through Chatham County's procurement portal at https://chathamcountyga.bonfirehub.com/portal; direct contact with County departments is prohibited.
Required submission documents include Attachments A–I, a List of Subcontractors, References, a Pricing Sheet in Excel format, and Surety Forms and Bid Bond, all submitted as vendor file uploads through the portal.
Opportunity text
Rehabilitation of an existing pump station owned and operated by Chatham County at 2505 Salcedo Ave, Savannah GA 31406. The pump station is a duplex submersible pump station. Rehabilitation scope includes removing the existing pumps and replacing them with new pumps and associated piping, fittings, valves. The scope of the rehabilitation includes pigging the existing force main, constructing a new discharge valve vault, Installation of auxiliary equipment such as a permanent bypass pump and electrical and SCADA work associated with such.
Files
| File | Type | Posted |
|---|---|---|
| Document-1783691314568.pdf | ||
| Specifications 26-0078-3.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity