The City of Seattle Department of Transportation is requesting bids for the Roosevelt Way Preservation Project under PW# 2025-074, a federally funded roadway rehabilitation and safety improvement program, with bids due November 4, 2026 at 2:00 p.m. A 13% Federal Small Business Enterprise (FSBE) participation goal applies; bidders must make good faith efforts to meet this goal.
The scope encompasses asphalt overlay planing; removal and replacement of concrete panels with base repair; intersection realignment at NE 113th Street; curb bulb installation at NE 114th Street and NE 115th Street; ADA-compliant curb ramp installation; sidewalk removal and restoration; traffic channelization, signing, and concrete bike barriers; driveway work; traffic signal installation; landscaping and storm drainage improvements; and pedestrian safety enhancements. Rebar installation and electrical work are identified as required trades. Work extends along Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE, spanning King County and Spokane City jurisdictions.
The A/E estimate is $12.5 million to $12.8 million. Contract completion is required within 250 working days of the Notice to Proceed. Bidders must submit a bid guaranty of no less than 5% of the maximum bid amount including retail sales tax and a Bidder/Subcontractor List (required for projects exceeding $1 million). A Recycled Materials Proposal is also required.
Work is subject to federal prevailing wage (Davis-Bacon) and state minimum wage requirements, Seattle Paid Sick and Safe Time (SMC 14.16), and a Consent Decree among the City, EPA, and Washington State Department of Ecology regarding sanitary sewer and dry weather overflows. Liquidated damages apply for failure to achieve substantial completion within contract time.
Opportunity text
The Roosevelt Way Preservation Project consists of planing the asphalt overlay and the removal and replacement of select areas of concrete panels and base repair. The project also includes the intersection realignment at NE 113th Street and the installation of curb bulbs at NE 114th Street and NE 115th Street. The work also includes the installation of ADA compliant curb ramps, sidewalk removal/restoration, channelization, signing, concrete bike barriers, driveways, traffic signals, landscaping, storm drainage, and pedestrian safety improvements, and other project elements. For the purpose of the Bidder/Subcontractor list, this project includes Rebar Installation and Electrical work. FSBE 13% goal
Files
| File | Type | Posted |
|---|---|---|
| 2025-074_Roosevelt_Way_Preservation_Specs.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity