About this opportunity

The School District of Greenville County, South Carolina is requesting bids on a remedial roof replacement project at Slater-Marietta Elementary School (100 Baker Circle, Marietta) under Solicitation No. 127-13, with bids due September 18, 2026 at 10:00 a.m. and a pre-bid conference on September 10, 2026 at 10:00 a.m. at the school site. General contractors must utilize pre-qualified roofing contractors from the District's approved list and hold a valid General Contractor's License prior to bid due date — a mandatory capability filter.

The scope covers complete remedial roof replacement across three roof areas (A1, B1, B2) totaling 11,970 square feet. Work includes removal of existing modified bitumen roofing, wood plank decking, flashings (including lead), gutters, and downspouts; installation of new 60-mil TPO single-ply membrane roofing; structural repairs to trusses and purlins; new metal flashings and drainage components; wood blocking and plank deck replacement with unit pricing required (500 board feet base for blocking; 1,000 board feet base for plank deck at Roof Areas B1 and B2 only); lead-based paint disturbance management; and curb and vent-pipe extensions per FM 1-49 standards. A $50,000 owner's contingency is included. The District offers pre-qualified mechanical contractors as optional but not required.

Performance and Payment Bonds and 5% bid security are required. The contractor must provide a five-year warranty in addition to the manufacturer's 20-year no-dollar-limit warranty. Project duration is 180 calendar days from October 19, 2026 through April 16, 2027. Liquidated damages are $1,000 per day after the required completion date. The contract award period is one year from award date. Questions are due September 11, 2026 at 10:00 a.m. via the Procurement Portal at https://procurement.opengov.com/portal/greenvillek12sc. All bids must be submitted electronically; faxed or emailed submissions are not accepted.

Opportunity text

Work under this Contract consists of furnishing all labor, materials and equipment necessary to perform the quality remedial roof replacement at Slater-Marietta 12 Elementary School, located at 100 Baker Circle, Marietta, South Carolina 29661, as shown on Drawing Nos. G-001 through S-101. The work will include, but is not necessarily limited to, the following:Roof Replacement activities will include Roof Areas A1, B1, and B2. The work will include, but is not necessarily limited to, the following:1. Remove and properly dispose existing modified bitumen roofing system, and associated insulation down to the existing wood plank deck.a. At Roof Area A1, remove and properly dispose of the existing wood plank deck.2. Remove and properly dispose existing base flashings and cant strips.3. Remove and properly dispose the existing metal flashings, including lead flashings, scupper liners, gravel stop, fascia, coping, and counter flashings.4. Remove and properly dispose existing downspouts, and conductor heads.5. supports.6. pans.7. surface.8. surface.9. Remove and properly dispose existing gutters, gutter spacers, and gutter bracket Remove and properly dispose existing pipe flashings including lead flashing and pitch Raise existing curbs to a minimum finished flashing height of 8 inches above the new roof Extend soil vent pipes to a minimum height of 8 inches above the new roof Enlarge existing scupper openings as noted on drawings.10. Furnish and install new wood blocking at roof eaves and rake edges to match the level of the new roof.11. Furnish and install new wood blocking at parapets to maintain a minimum of 8 inches of flashing height above the new finished roof surface in accordance with FM 1-49.12. At Roof Area A1, furnish and install new tongue and groove wood plank deck (as shown on drawings), new loose laid thermal barrier, new mechanically fastened polyisocyanurate insulation, a second layer of adhered polyisocyanurate insulation, a third layer of adhered polyisocyanurate insulation, adhered coverboard, and a new 60-mil adhered TPO roof system.a. Provide manufacturers 20-year No Dollar Limit Warranty.13. At Roof Areas B1 and B2, furnish and install new loose laid thermal barrier, new mechanically fastened polyisocyanurate insulation, a second layer of adhered polyisocyanurate insulation, adhered tapered polyisocyanurate insulation, adhered coverboard, and a new 60-mil adhered TPO roof system.a. Provide manufacturers 20-year No Dollar Limit Warranty.14. Furnish and install new 60-mil TPO base flashings as specified.15. Furnish and install new metal flashings including but not limited to gravel stops, drip edge, copings, fascia metal, and counterflashing as specified.16. Furnish and install new primary scupper liners, overflow scupper liners, downspouts and conductor heads as specified.17. Furnish and install new gutters, gutter spacers, and gutter bracket supports as specified.18. Furnish and install new splash blocks at all downspouts that empty onto the roof surface or onto the ground, as specified.19. Furnish and install new pipe vaults where pitch pans or portal curbs are existing. At locations where a single penetration is present, which can be flashed with a roof system manufacturer warrantied detail, a pipe vault is not required.20. Furnish and install new walkway pads at locations shown on drawings.21. Furnish and install new snowguards at gutter eave locations. Coordinate with roof system manufacturer for inclusion in warranty.22. aspects of the work to ensure a daily watertight building envelope.23. Coordinate all Furnish and install any miscellaneous items.

Files

File Type Posted
Slater-Marietta Gym Roof Replacement Project.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity