RFQ Repair Water Tower B738

Closed State & local contract opportunity Posted

Solicitation number
FA303026Q0013
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Goodfellow Air Force Base in San Angelo, Texas is requesting quotes on repair and repainting of Water Tower B738, a 400,000-gallon elevated water storage tank, under a Total Small Business Set-Aside (NAICS 237110), with quotes due August 24, 2026.

This is a Total Small Business Set-Aside — only SBE-certified firms are eligible. The scope includes complete interior surface preparation, removal of existing coatings, and application of new interior protective coatings to meet potable-water standards; metal fabrication repairs including replacement of the overflow stub pipe, installation of a new riser access manway, replacement of the internal riser access ladder, and installation of new steel bar safety grating to comply with current NFPA and OSHA requirements. The contractor must furnish all materials, tools, rigging, equipment, labor, management, and supervision.

The contract performance period is 120 calendar days. The contractor must mobilize within 10 calendar days of award and submit a baseline construction schedule within 10 calendar days of award prior to commencing work. Work proceeds Monday through Friday, 7:30 a.m. to 4:30 p.m., with deviations requiring 48 hours advance notice and Contracting Officer approval. The Government provides utilities at no cost. All contractor personnel must obtain base access passes through DBIS or AF Form 75A. The contractor must obtain hot-work permits before welding, cutting, or grinding; maintain site-specific safety protocols addressing barriers, PPE, spill containment, first aid, fire extinguishers, and smoking areas; provide portable toilet facilities; and remove all construction debris and temporary structures within 30 days of completion. As-built drawings and GPS coordinates for underground utilities are due within 20 days of substantial completion. Weekly job progress meetings are required.

Opportunity text

Total Small Business Set-Aside, 237110 - Water and Sewer Line and Related Structures Construction. This project involves repairing and repainting the interior of a 400,000gallon multicolumn elevated water storage tank, including the main center column and stem. Work includes complete surface preparation, removal of existing coatings, and application of new interior protective coatings to restore structural integrity and ensure compliance with potablewater standards. Metal fabrication repairs are required to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating. These upgrades are necessary to meet current NFPA and OSHA requirements and to ensure safe access, proper overflow function, and longterm operational reliability of the elevated water storage tank.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity