REBID Sumner Library Construction

Closed State & local contract opportunity Posted

Solicitation number
062926
State
Washington
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Sumner, Washington is requesting bids for construction of a new public library building with associated site work, with bids due July 17, 2026. LEED v4.1 Silver certification is mandatory; the contractor must procure LEED-compliant materials, track and document all LEED credits, maintain waste management and indoor air quality protocols, and submit all documentation to the USGBC LEED Online platform for certification.

The scope encompasses removal of existing preload surcharge and earthwork; site development conforming to City of Sumner zoning regulations and East Main Street design guidelines; construction of new parking areas and site improvements on the south portion; utility extensions and connections; a fully enclosed, conditioned library building with structural, architectural, mechanical, electrical, plumbing, fire protection, and life safety systems; interior finishes, fixed furnishings, and casework; and coordination of deferred submittal components including roof truss design, buckling-restrained bracing, and aggregate pier systems. The contractor is responsible for all labor, materials, equipment, supervision, testing, inspections, permits, and services necessary for a complete operational facility.

The City of Sumner requires separate bonds for work associated with ROW permit, TESC permit, storm facilities work, and site landscaping. Bidders must carry the cost of such bonds in their bid and include an allowance equal to 5% of the value of these specific scopes of work for bond-related costs unless actual costs are otherwise known.

This is a rebid; no incumbent, prior contract value, or contract term is identified in the posting.

Opportunity text

Removal of existing preload surcharge and related earthwork. Site development in conformance with City of Sumner zoning regulations and East Main Street design guidelines. Construction of new parking areas and associated site improvements on the south portion of the site. Utility extensions and connections. Construction of a fully enclosed, conditioned public library building including structural, architectural, mechanical, electrical, plumbing, fire protection, and life safety systems. Installation of interior finishes, fixed furnishings, casework, and building systems as indicated in the Contract Documents. Coordination and incorporation of deferred submittal components, including but not limited to roof truss design, buckling-restrained bracing, and aggregate pier systems. All labor, materials, equipment, supervision, testing, inspections, permits, and services necessary to provide a complete and operational facility in accordance with the Drawings and Specifications. Plan, manage, and execute all construction activities in alignment with the U.S. Green Building Councils (USGBC) LEED v4.1 rating to achieve LEED Silver certification. Include but not limited to procuring LEED-compliant materials, tracking and documenting all LEED credits; maintaining waste management, indoor air quality, and commissioning requirements; and submitting all documentation necessary for certification through USGBCs LEED Online platform. Bidders are advised that the City of Sumner requires separate bonds for work associated with the ROW permit, TESC permit, storm facilities work, and site landscaping. Bidders shall carry the cost of such bonds in their bid. For bidding purposes, include an allowance equal to 5% of the value of these specific scopes of work for bond-related costs unless actual costs are otherwise known.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity