Stoner Avenue Bridge Rehabilitation Re-Bid

Closed State & local contract opportunity Posted

Solicitation number
26-037
State
Louisiana
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Shreveport is requesting sealed bids on rehabilitation of the Stoner Avenue Bridge over Line Avenue under IFB 26-037, with bids due July 28, 2026 at 2:00 p.m. The project is subject to Louisiana Uniform Public Work Bid requirements and a Fair Share Program targeting 25% participation of certified small disadvantaged businesses.

The scope includes removal and replacement of bridge bearings, approach slabs, and other structural components; improvements to the driving surface of the bridge deck and drainage system; and multiple unit-price line items covering clearing and grubbing, concrete work, paving, geotextile fabric, riprap, temporary signage, pavement striping, bearing pads, expansion joints, epoxy injection, structure jacking, and a polymer composite micro-overlay system. The bridge is located in City Council District B within Caddo Parish. Contract completion is required within 75 working days from the authorized start date.

The designer's estimate is $2,707,800. A bid bond equal to 5% of the total bid amount, including all alternates, is required. The successful bidder must provide a 100% performance bond, 50% payment bond, and a two-year 10% maintenance bond. Contractor licensing is required for bids exceeding $50,000 under state law. Partial payments will be made monthly with 10% retainage. Liquidated damages apply for work incomplete after the contract time expires, with daily charges ranging from $80 to $600 depending on the original contract amount.

Plans are dated May 14, 2026 and prepared by Halff Associates. A non-mandatory pre-bid conference was scheduled for July 10, 2026 at 10:00 a.m. Award will be made to the lowest responsive and responsible bidder based on established evaluation criteria.

Opportunity text

This project entails the rehabilitation of the Stoner Avenue over Line Avenue bridge. This work includes but is not limited to, removal and replacement of bridge bearings, approach slabs, and other structural components of the bridge. Additionally, improvements to the driving surface of the bridge deck and drainage system will be required. This project is located within City Council District B.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity