Rayburn - East 69kV Reroute Project - Transmission Line Construction
Closed State & local contract opportunity Posted
- Solicitation number
- 037-11-26
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Catherine Benavides cbenavides@bryantx.gov (979) 821-5860
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Bryan Texas Utilities (BTU) is requesting bids for the Rayburn-East 69kV Reroute Project transmission line construction, with bids due September 30, 2026 at 2:00 p.m. CST and a mandatory pre-bid meeting on September 15, 2026 at 9:30 a.m. CST at BTU's Distribution Conference Room in Bryan, Texas.
The scope encompasses approximately 0.75 miles of new 69/138kV transmission line construction with steel and concrete pole structures, multiple foundation types, transmission insulators, conductors (795 kcmil ACSR Drake and 1033 kcmil ACSR Curlew), and fiber optic ground wire (OPGW). The project also includes removal of existing transmission line components, distribution wire relocation, site work, clearing timber from approximately 18.16 miles of single-circuit transmission line between the Amite 115 kV Substation and the Hammond 115 kV Substation, removal of hazard trees outside the right of way, and repair and reseeding of cleared right of way areas. Work must comply with BTU specifications and Entergy specifications for applicable sections. Owner-furnished materials listed in Appendix A are excluded from bid pricing.
The total bid amount must include a 20% contingency and $15,000 testing allowance, with unit prices available for potential line-item adjustments of up to 5%. Bidders must submit firm prices for a minimum of 90 days from bid opening, a 5% bid bond, and performance and payment bonds equal to 100% of the contract price. Commercial general liability insurance of $5,000,000 is required. Liquidated damages of $5,000 per day apply for delays past May 14, 2027. Construction commences November 19, 2026, with energization targeted for January 4, 2027 and project completion by May 14, 2027. BTU will evaluate bids on purchase price, reputation, quality, past performance, and compliance with city ordinances. Written questions are due September 22, 2026 at 3:00 p.m. CST. Award is anticipated in October 2026, with board approval and pre-construction conference in November 2026.
Opportunity text
Clear timber from approximately 18.16 miles of single circuit transmission line from the Amite 115 kV Substation to the Hammond 115 kV Substation. Remove hazard trees from outside the right of way as specified. Repair and reseed cleared right of way as specified
Files
| File | Type | Posted |
|---|---|---|
| RFB 037-11-26 Rayburn-East 69kV Reroute.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity