Fulton County, Georgia is requesting proposals for Progressive Design-Build Services for Phase I of the Friendship Pump Station project, with proposals due August 12, 2026, and a pre-proposal conference scheduled for July 22, 2026 via Zoom. The scope encompasses design development at 30%, 60%, and 80% completion levels; geotechnical surveys; permitting and environmental compliance; easement acquisition; transient analysis for the forcemain; and compilation of a guaranteed maximum price based on competitive work-package bidding. The project includes design and construction of one new pump station and approximately 12,500 linear feet of forcemain within the City of South Fulton, serving the sewer drainage basin between South Fulton Parkway, Cochran Mill Road, Cedar Grove Road, and Rivertown Road.

Key personnel must have a minimum of five years' experience in force main and pump station design and construction; the Project Manager must hold five years of such experience within the past five years. All proposals require a 5% bid bond. The selected team must substantially complete Phase I design and GMP development within 210 calendar days of Notice to Proceed, with final completion within 300 calendar days. Liquidated damages of $1,000 per calendar day apply for work not completed by the specified deadline.

Evaluation uses a 100-point scale: project plan and approach (35%), qualifications of key personnel (15%), relevant project experience (20%), availability of key personnel (5%), local preference (5%), service-disabled veterans preference (2%), and cost proposal (18%). Tentative oral interviews are scheduled for August 24, 2026, with anticipated Board of Commissioners approval on September 16, 2026. The County has not specified an Owner's Available Funds amount.

Opportunity text

Fulton County, Georgia (County) is seeking qualified firms to provide Progressive Design-Build Services (PD/B Services) for the design and compilation of a guaranteed maximum price (GMP) for the final design and construction of Friendship Pump Station and its connected forcemain.

This is Phase I of The Friendship Pump Station Progressive Design Build(FPS) . The FPS, which includes the associated force main, will serve the sewer drainage basin between South Fulton Pkwy, Cochran Mill Road, Cedar Grove Road and Rivertown Road. An Additional pump station, known as Cochran Road Pump Station (CRPS), will be built by Minerva USA near 5405 Cochran Mill Rd, that will convey flows to FPS. Both FPS and CRPS flows will be discharged to the Fulton County Cedar Grove Pump Station and to the Jones Road interceptor sewer where a tee, valve and manifold shall be installed for future connection. The invert Elevation at FPS will be set to allow the gravity system to enter from both northern and western sides of the wet well.