Prequalification for Dead Run at Georgetown Pike

Open State & local contract opportunity Posted

Solicitation number
SD-000031-230
State
Virginia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Fairfax County is soliciting prequalifications for construction of Dead Run at Georgetown Pike, with prequalification submissions due October 23, 2026; only prequalified firms will be permitted to submit bids, and bids from non-prequalified bidders will not be considered.

The scope encompasses restoration of 5,916 linear feet of stream using natural channel design and riparian corridor enhancements to improve water quality, including removal of invasive plants and replacement with native trees, shrubs, and herbaceous vegetation. The project also requires installation and 24-hour continuous operation and maintenance of a sanitary sewer force main bypass pumping system with flows up to 2,600 gallons per minute, as well as pre- and post-construction CCTV inspection of the sanitary sewer force main.

Prospective bidders must demonstrate relevant experience, financial capability, and technical qualifications to satisfy prequalification requirements and evaluation criteria outlined in the prequalification procedures document (846052preqFfax.pdf). The prequalification procedures establish specific response deadlines, site visit requirements, and bidders' conference details.

Opportunity text

Fairfax County (County) is soliciting Pre-Qualifications of bidders for the construction of the Dead Run at Georgetown Pike. Only firms that have been pre-qualified in accordance with the procedures set forth herein will be allowed to submit bids for this project. Bids received from those who have not been pre-qualified will not be considered. The scope of work includes but is not limited to restoration of 5,916 linear feet of stream using natural channel design and riparian corridor enhancements to improve water quality. Invasive plants will be removed and replaced with native trees, shrubs, and herbaceous vegetation. Additionally, the project requires a sanitary sewer force main bypass pumping system with flows up to 2,600 gallons per minute, requiring continuous 24-hour operation and maintenance while the bypass system is in service, as well as pre- and post-construction CCTV inspection of the sanitary sewer force main.