Phase 1a (Terrace Park)

Closed State & local contract opportunity Posted

Solicitation number
2137410
State
New York
Responses due

Opportunity facts

Jurisdictions
Point of contact

Updated .

About this opportunity

New York State Parks, Recreation and Historic Preservation is seeking bids on Phase 1a (Terrace Park) at High Falls State Park in Rochester, Monroe County, with proposals due August 5, 2026. The project includes a mandatory Project Labor Agreement (PLA), and failure to submit required PLA documents — a Project Labor Agreement List of Subcontractors and Subcontractor Letters of Assent — will result in bid disqualification.

The scope encompasses park construction with amenities, landscaping, and trails. Available MBE/WBE/SDVOB subcontractor scopes include mobilization; erosion and sediment control; site protection and preparation; temporary controls and traffic maintenance; dewatering and snow removal; selective and structural demolition with salvage palletizing; excavation and disposal of contaminated soils; pile foundations; cover and cap materials; earthwork; and stormwater management facilities.

The contract is scheduled for completion in 365 days. All bid submissions must include a Contractor's List of Subcontractors (PLA) and Subcontractor's Letter of Assent, submitted as a separate attachment in accordance with the Supplemental Instructions to Proposers — Project Labor Agreement. Full plans and specifications are available for free download at https://coldspringconstruction.sharefile.com/d-s929c79c182c54ff789e403fa27d63320, or by request from Brett J. Bottone, Vice President – Engineering, at 716-542-2011 or bbottone@coldspringconstruction.com.

Opportunity text

Cold Spring Construction Co. intends to bid on New York State Parks, Recreation and Historic Preservation, D006636 Phase 1a (Terrace Park) High Falls State Park, which will be let on August 5, 2026. This contract provides for park construction with amenities, landscaping and trails, in the City of Rochester, in Monroe County. It is scheduled for completion in 365 days. Full plan and specifications for the project are available for free download at the link below: https://coldspringconstruction.sharefile.com/d-s929c79c182c54ff789e403fa27d63320 This project contains a Project Labor Agreement (PLA). PLA projects require a Project Labor Agreement List of Subcontractors (Sub List) completed by the Prime and Project Labor Agreement - Letter of Assent to be completed by both the Prime and Subcontractor. All PLA related documents should be included in a separate attachment in accordance with the Supplemental Instructions to Proposers - Project Labor Agreement. Failure to submit these forms correctly will result in a disqualification of the bid. All bids submissions must include: Contractor's List of Subcontractors (PLA) and Subcontractor's Letter of Assent. Electronic files of plans and proposals can also be made available for download from Cold Spring Construction. Requests for download and/or further information concerning the project may be obtained from Brett J. Bottone, Vice President - Engineering at 716-542-2011 or via email at bbottone@coldspringconstruction.com. Available MBW/WBE/SDVOB/subcontractor scopes for this project: Mobilization · Erosion and Sediment Control, Site Protection, Preparation and Staging · Installation of Temporary Controls (i.e. Tree Protection, project sign) · Maintenance and Protection of Traffic · Dewatering and/or Snow Removal · Selective and Structure Demolition including palletizing items to be salvaged · Excavation and disposal of contaminated soils · Pile Foundations · Cover/cap Materials · Earthwork, stormwater management facilities · Utility infrastructure, terminations and new service stubs including site lighting, ROW lighting and ROW signals · ROW intersection reconstruction · Bathroom building and Pavilion structures · Playground surfacing and equipment · Concrete/Asphalt/Wood Decking Walkways and lay-ins · Soil, Sod and Plantings · Site Furnishings and Railings, including boulders and seating · Orientation and interpretive signs · Final project cleaning and disposal · Demobilization · Closeout · On-going plant care for warrantee Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 11.00% WBE Goal: 19.00%