PCE-Round 3 Prop 1 Implementation Groundwater Well and Treatment Improvement Project (Packet 3)
Closed State & local contract opportunity Posted
- Solicitation number
- 2091506-03
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Miguel Barcenas mbarcena@slocity.org (805) 781-7507
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
San Luis Obispo County and San Francisco are soliciting bids for design, engineering, or construction services related to the PCE-Round 3 Prop 1 Implementation Groundwater Well and Treatment Improvement Project (Packet 3), with proposals due October 1, 2026.
The scope encompasses equipping two existing groundwater wells with well buildings (concrete foundations, concrete masonry unit block walls, and structural steel roof frame), a consolidated granular activated carbon treatment system, submersible well pumps, and appurtenances. The treatment system includes prefiltration, granular activated carbon pressure vessels, chlorination and fluoridation chemical systems, and backwash storage tanks. Mechanical work spans piping from the wells to the treatment system and from the treatment system under Highway 101 to the municipal water connection on Calle Joaquin. The project also requires electrical improvements, programming and installation of an operator interface terminal (OIT), and supervisory control and data acquisition (SCADA) modifications.
Opportunity text
In general, the project consists of equipping two (2) existing groundwater wells with well buildings, a consolidated granular activated carbon treatment system, well pumps, piping and appurtenances. The well buildings include concrete foundations, concrete masonry unit block walls, and structural steel roof frame. The treatment system includes prefiltration, granular activated carbon pressure vessels, chlorination and fluoridation chemical systems, and backwash storage tanks. Mechanical piping include submersible well pumps, piping from the wells to the treatment system, and piping from the treatment system under Highway 101 to the municipal water connection on Calle Joaquin. The project also includes electrical improvements, programming and installation of an operator interface terminal (OIT), and supervisory control and data acquisition (SCADA) modifications.