PAL-2026-01

Closed State & local contract opportunity Posted

Solicitation number
2138173
State
New York
Responses due

Opportunity facts

Jurisdiction
Point of contact

Updated .

About this opportunity

Palisades Region Administration, New York (Rockland County), is seeking to procure an EV charging system under a sole-source procurement (PAL-2026-01) with proposals due August 25, 2026. The procurement is restricted to Beam Global's EV ARC charging system, the only multivehicle charger meeting the region's requirement for off-grid, solar-powered operation capable of serving 10+ electric vehicles simultaneously while functioning 24/7 within existing parking-space footprints without expanding the facility's infrastructure footprint.

The region's current single EV charger at the Administration Building cannot support the expanded electric vehicle fleet required by increased regional procurement mandates. The Beam Global system's solar-powered, off-grid design eliminates dependency on grid capacity that would otherwise exceed the park's existing electrical infrastructure. The charger's transportability enables deployment across multiple operational areas as park needs evolve. Beam Global represents the sole vendor offering this combination of capabilities — off-grid functionality, solar power integration, 24/7 availability, easy transport, and preservation of existing parking configurations.

Opportunity text

Due to the increase in the required procurement of Electric Vehicles in the Palisades Regions fleet, the region does not have the infrastructural capacity to maintain the increased EV fleet as needed. The Palisades Region Administration Building only has one EV charger currently, which is shared between 10+ EV's. Beam Global provides the only multivehicle charger (EV ARC charging system) with a design that is off grid, powered by Solar Power, and works 24/7. The Beam Charger also has easy transport capabilities to different areas as needed for Park Operations. In addition to that, this design fits seamlessly in pre-existing parking spaces and will not impact the parks footprint. By utilizing Solar Power instead of the grid, the region will be able to support the EV fleets' needs without hindering the park's electric infrastructure. Beam Global is the only vendor to provide an EV charger design with the required capabilities, specifically needing to be off grid and work within our pre-existing footprint.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity