Pacific Avenue Corridor Improvement Project

Closed State & local contract opportunity Posted

Solicitation number
R-7280/ C-6785
State
California
Responses due

Opportunity facts

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Los Angeles is soliciting bids for the Pacific Avenue Corridor Improvement Project (Project No. R-7280), a street infrastructure improvement initiative, with proposals due October 5, 2026.

The scope encompasses mobilization and demobilization, Class A field office establishment, stormwater best management practices, traffic control, temporary water-filled barrier systems, monument restoration and survey coordination, construction staking, and LA Metro flagging and training. Work includes clearing and grubbing, unclassified excavation, removal of existing trees, full-depth asphalt concrete pavement removal with digouts and slot paving, removal of existing concrete sidewalks, curbs, curb and gutter, curb ramps, and driveways, removal of bus benches and bus shelters, cold milling of two-inch asphalt concrete pavement, and removal and salvage of existing street lighting. The contractor must furnish all necessary labor, materials, equipment, and incidental work to complete the project.

The project is located within Los Angeles County and the City of Los Angeles. No contract value, contract term, incumbent contractor, evaluation criteria, pre-bid meeting date, questions deadline, or set-aside or preference program information is disclosed in the available source material.

Opportunity text

In general, the work comprises without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to construct the Pacific Avenue Corridor Improvement Project, No. R-7280 which includes: Mobilization & Demobilization; Class A Field Office; Scheduling; Stormwater Best Management Practices (BMPs); Traffic Control; Temporary Water-Filled Barrier System; Monument Restoration & Perpetuation (Survey Marker & Corner Record File); Adjust Survey Monument Casing & Cover (Well); Construct Survey Ties; Construction Staking; LA Metro Flagging, Coordination & Training. Clearing & Grubbing; Unclassified Excavation; Remove Existing Tree; Remove Existing Full Depth Asphalt Concrete (AC) Pavement (R & R, Digouts, and Slot Paving); Remove Existing Concrete (Sidewalk, Curbs, Curb and Gutter, Curb Ramps, Driveways); Remove Existing Bus Bench; Remove Bus Shelter; Cold Mill 2 Inch AC Pavement; Remove & Salvage Existing Street Light.

Files

File Type Posted
Pacific Avenue Corridor Improvement Project.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity