Orinda Community Park Improvement - Phase 1 Project
Closed State & local contract opportunity Posted
- Solicitation number
- CIP4112
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Ha Nguyen hnguyen@cityoforinda.org (925) 949-9776
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Orinda, California is soliciting bids for the Orinda Community Park Improvement — Phase 1 Project, a comprehensive park site renovation, with bids due September 22, 2026 at 2:00 p.m. A non-mandatory pre-bid meeting is scheduled for September 1, 2026 at 10:00 a.m. at the project site, 26 Orinda Way, Orinda, CA 94563.
The successful contractor must hold a valid Class A License at the time of contract award — the primary eligibility gate.
The scope encompasses demolition and removal of existing asphalt pavement, concrete hardscape, handrails, landscaping, decorative boulders, and bollards; clearing and grubbing; rough and fine grading; installation of asphalt concrete paving, Class 2 aggregate base, grind-and-overlay, and pedestrian asphalt paths; concrete pedestrian paving; curb, gutter, vertical curb, and curb ramps with truncated domes; utility cover adjustments; wheel stops, parking, accessible parking, and related signage; pavement striping and markings including No Parking, ISA white lines, and crosshatch markings; miscellaneous landscaping; slurry seal and Type II micro-surfacing; storm drain improvements including pop-up emitters, cleanouts, and 4-inch PVC storm drain pipe; park sign reinstallation; temporary traffic control; water pollution control measures; surveying and staking; and mobilization, demobilization, and incidental restoration and cleanup work.
The engineer's cost estimate is $240,000. Place of performance is the project site in Orinda, Contra Costa County, California.
Inquiries should be directed to Ha Nguyen, City of Orinda representative, at 925-949-9776 or Hnguyen@cityoforinda.org.
Opportunity text
Scope of Services: The Work to be performed consists of furnishing all labor, materials, equipment, tools, and incidentals necessary to complete the Community Park Improvement Project, including mobilization, demobilization, temporary traffic control, installation of water pollution control measures, surveying and staking, demolition and removal of existing asphalt pavement, concrete hardscape, handrails, landscaping, decorative boulders, pop-up emitters, & bollards; clearing and grubbing; rough and fine grading; asphalt concrete paving, Class 2 aggregate base, grind and overlay, pedestrian asphalt paths, pedestrian concrete paving, curb and gutter, vertical curb, curb ramps, and truncated domes; adjustment of utility covers; installation of wheel stops, park and accessible parking signs, and related signage; pavement striping and markings, including No Parking, ISA, white lines, and crosshatch markings; miscellaneous landscaping; slurry seal/Type II micro-surfacing; storm drain improvements, including pop-up emitters, cleanouts, and 4-inch PVC storm drain pipe; reinstallation of park signs; and all related restoration, coordination, cleanup, and incidental work necessary to provide a complete, safe, accessible, and functional Project.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-Orinda Community Park Improvement - Phase 1 Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity