Orchard Avenue Sidewalk Improvements

Closed State & local contract opportunity Posted

Solicitation number
HLA 26038
State
Washington
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Selah, Washington is requesting sealed bids for removal and replacement of cement concrete sidewalk, curb, and gutter on Orchard Avenue (HLA Project No. 26038), with bids due July 22, 2026 at 11:00 a.m. at Selah City Hall. All work is subject to prevailing wage requirements as determined by the Washington State Department of Labor and Industries for Yakima County, effective July 22, 2026.

The scope includes approximately 300 cubic yards of unclassified excavation, 320 tons of crushed surfacing base course, 10 tons of crushed surfacing top course, 100 tons of HMA Class 3/8-Inch PG 64H-28, 640 linear feet of cement concrete curb and gutter, 40 linear feet of pedestrian curb, 180 square yards of 6-inch thick cement concrete sidewalk, 270 square yards of 4-inch thick cement concrete sidewalk, storm sewer pipe, underdrain pipe infiltration trench system, catch basins, meter box adjustments, and erosion control measures. Contract time is anticipated to begin by August 24, 2026 with fifteen working days allowed for project completion. Liquidated damages apply for failure to meet the completion deadline.

Bidders must submit a bid deposit or bid bond equal to not less than 5% of the total bid amount, along with a non-collusion affidavit, certification of compliance with wage payment statutes, and supplemental bidder responsibility criteria statement. The successful bidder must execute a contract bond equal to 100% of the contract price within ten working days of notice of award. The Engineer is HLA Engineering and Land Surveying, Inc., represented by Terry D. Alapeteri, PE. Sealed bids will be opened publicly and read at the City Hall Conference Room. The City of Selah reserves the right to reject any and all bids.

Opportunity text

The project involves removal and replacement of cement concrete sidewalk, and curb and gutter on one side of one city block including approximately 300 CY of unclassified excavation, 320 TONS of crushed surfacing, 100 TONS of HMA, 640 linear feet of cement concrete curb, and 450 SY of cement concrete sidewalk.

Files

File Type Posted
26038-Spec.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity