Obsolete Bus Stop Shelter Replacement
Open State & local contract opportunity Posted
- Solicitation number
- C26076
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Kimmy Truong kimmy.truong@vta.org (408) 321-7078
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Santa Clara Valley Transportation Authority (VTA) is requesting bids on bus stop shelter replacement and infrastructure upgrades at 19 locations across the City of San Jose, Santa Clara, VTA Transit Centers, Mission College, and Evergreen Valley College Campus under IFB Contract C26076, with bids due October 20, 2026 at 3:00 p.m. Pacific Time. The VTA has established a Small Business Enterprise (SBE) goal of 19% for this contract.
The scope encompasses removal and salvage of existing transit shelters and benches; installation of new shelters and shelter benches; connection of new shelter lighting to existing VTA infrastructure; replacement of damaged Portland cement concrete sidewalks, concrete bus pads, curbs, and gutters; installation of new shelter lighting pull boxes connected to existing or new city electrical junction boxes; installation of detectable directional surface tiles and trash receptacles; and refreshing of curb paint and bike and traffic lane striping. All work is subject to California prevailing wage requirements under California Labor Code.
All bidders and subcontractors must hold current California contractor licenses (Class A General Engineering or a combination of Class B General Building plus appropriate Class C licenses) and be registered with the California Department of Industrial Relations. Bidders must also provide California Air Resources Board certificates for applicable vehicle fleets.
The base contract term is one year. Bid security equal to 5% of the Total Bid Price is required in the form of a certified check, cashier's check, cash, or bid bond. Bids must include full compensation for all labor, materials, tools, equipment, services, applicable taxes, freight charges, and fees.
The pre-bid conference is scheduled for September 29, 2026 at 2:00 p.m. via Microsoft Teams. The deadline for submitting IFB comments is October 13, 2026 at 3:00 p.m. Pacific Time. The Notice of Recommended Award is anticipated for October 30, 2026. Award will be made to the lowest responsive and responsible bidder based on Total Bid Price. This is a locally funded project not subject to federal requirements.
Opportunity text
Project scope includes upgrades to 19 existing bus stops located in the City of San Jose, Santa Clara, VTA Transit Centers, Mission College and Evergreen Valley College Campus. Upgrades to bus stops include but are not limited to removing and salvaging existing transit shelters, and shelters benches. Installing new shelters and shelter benches. Connect new shelter's lighting to existing VTA shelter lighting pull box. Bus stop upgrades also include replacing damaged PCC sidewalks, concrete bus pads, curbs and gutters. Additional improvements to the bus stop also include but is not limited to installing new shelter lighting pull box and connecting new pull box to existing or new city's junction electrical pull box, installing detectable directional surface tile, trash receptacle, refreshing curb paint as well as bike and traffic lane stripe
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity