Nutting Fields Turf Replacement Project
Closed State & local contract opportunity Posted
- Solicitation number
- BD-26-1349-TOW01-TOW01-121082
- State
- Massachusetts
- Responses due
Opportunity facts
- UNSPSC code
- Point of contact
-
- <Unknown> medwards@westfordma.gov (978) 692-5501
Opportunity details come from commbuys.com. Updated .
About this opportunity
The Nutting Fields Turf Replacement Project is a Massachusetts state-level procurement opportunity focused on comprehensive synthetic turf system installation. The project requires a contractor to furnish and install a complete infilled synthetic turf system, which includes a shock pad, turf carpet, infill, and associated accessories, to be placed over an existing stone base. Contractors must successfully remove and recycle existing materials prior to new installation. The procurement is currently open, with a posting date of September 18, 2025, and a proposal submission deadline of October 9, 2025. Potential bidders will need to demonstrate technical expertise in synthetic turf system installation, possess appropriate construction and landscaping credentials, and show capability to manage complex athletic field renovation projects. While specific evaluation criteria are not detailed in the provided documentation, contractors can anticipate being assessed on technical capabilities, installation methodology, material quality, and project completion timeline.
The contract opportunity does not explicitly indicate specific set-aside designations or restrictions for disadvantaged business enterprises. No incumbent vendors or current contractors are mentioned in the available information. The scope suggests this is a municipal or local government project, likely for a public recreational or educational facility, though the exact location within Massachusetts is not specified. Given the comprehensive nature of the turf replacement project, which involves complete system replacement including base preparation, shock pad, and synthetic turf installation, potential contractors should expect a substantial project investment. While no precise budget range is provided, similar municipal athletic field renovation projects typically range from $500,000 to $1.5 million, depending on field size, complexity, and specific technical requirements. Interested contractors should carefully review all project specifications and be prepared to provide detailed technical proposals demonstrating their capacity to execute this specialized infrastructure improvement project.
Opportunity text
Furnish and install a complete infilled synthetic turf system, including shock pad, turf carpet, infill, and accessories, over the existing stone base, following removal and recycling of existing materials.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity