Northwest Development Water Main Extension
Closed State & local contract opportunity Posted
- Solicitation number
- CSP18-26
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Purchasing Dept. purchasing.info@epwater.org (915) 594-5627
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
El Paso Water Utilities Public Service Board is requesting proposals for the Northwest Development Water Main Extension (CSP 18-26), a water infrastructure construction project in El Paso County, Texas, with proposals due August 12, 2026 at 1:30 p.m. local time. Offerors must demonstrate Service-Disabled Veteran participation or provide evidence of good faith efforts to achieve participation goals.
The project involves the installation of approximately 4,918 linear feet of 16-inch Class 350 Ductile Iron Pipe beginning at the intersection of Los Mochis Drive and S. Desert Boulevard, extending north within an existing easement parallel to S. Desert Boulevard. Work includes furnishing and installation of 12-inch PVC C-900 pipe, 30-inch diameter steel casing via bore and open-cut methods, gate valves with manholes, air release and vacuum valves with manholes, blowoff valves with manholes, fire hydrants with DATV valves, pressure testing and disinfection, bypass pumping, tie-in activities, trench safety systems, traffic control, 5-foot-wide by 4-inch-thick concrete caps, stormwater pollution prevention and flood control measures, pipeline videotaping, and full restoration of disturbed paved and unpaved areas including pavement, curb and gutter, sidewalks, signage and striping, cement-stabilized backfill where required, final grading, and site cleanup. Substantial completion is required within 180 calendar days and final completion within 210 calendar days from contract commencement.
This is a Unit Price Item Contract. Proposals are evaluated on seven factors: Financial Capacity (Pass/Fail), Safety Qualifications (Pass/Fail), Company Relevant Experience (25 points), Key Personnel Qualifications (15 points), Project Baseline Schedule (Pass/Fail), Project Approach (20 points), and Total Proposal Price (40 points). Offerors must submit proposal security equal to five percent of the bid amount as a certified check, cashier's check, or surety bond. The selected contractor must provide 100 percent Performance and Payment Bonds. A pre-proposal meeting is scheduled for July 29, 2026 at 10:00 a.m. via Microsoft Teams. Contract documents are available exclusively through El Paso Water's IonWave electronic bidding website. A Cone of Silence policy applies to communications regarding the proposal.
Opportunity text
The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: The project consists of the installation of a new 16-inch water main beginning at the intersection of Los Mochis Drive and S. Desert Boulevard (TxDOT) and extending north within an existing easement parallel to S. Desert Boulevard. The proposed improvements include approximately 4,918 linear feet of 16-inch Class 350 Ductile Iron Pipe (DIP). The project will be delivered as a Unit Price Item Contract and includes the furnishing and installation of all labor, materials, equipment, and appurtenances necessary to complete the work. Major work items include 16-inch DIP, 12-inch PVC C-900 pipe, 30-inch diameter steel casing installed by bore and open-cut methods, 16-inch gate valves with manholes, combination air release/vacuum valves with manholes, blowoff valves with manholes, fire hydrants with DATV valves, pressure testing and disinfection, miscellaneous piping and fittings, bypass pumping, tie-in activities, trench safety systems, and traffic control. The project also includes the installation of a 5-foot-wide by 4-inch-thick concrete cap, stormwater pollution prevention and flood control measures, pipeline videotaping, and restoration of all disturbed paved and unpaved areas to equal or better condition. Restoration work includes pavement, curb and gutter, sidewalks, signage and striping, cement-stabilized backfill where required, final grading, and site cleanup.
Files
| File | Type | Posted |
|---|---|---|
| Front Ends _ Specs - CSP18-26 Northwest Develop Water Mn Ext.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity