Northside High 600 Hall and 600 Hall Addition Reroofing
Closed State & local contract opportunity Posted
- Solicitation number
- MA2023J
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Jessica Albright jessica.albright@onslow.k12.nc.us (910) 455-2211
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Onslow County Schools is requesting proposals for reroofing services at Northside High School (600 Hall and 600 Hall Addition) with proposals due July 22, 2026 at 2:00 p.m., and a mandatory pre-bid site visit on June 16, 2026 at 10:00 a.m.
The scope covers removal of existing EPDM single-ply membrane and metal trim, installation of new 3/8-inch gypsum core boards with fiberglass facer mat, and a new 60-mil reinforced smooth white fully adhered TPO membrane roofing system with specified metal trim and flashing materials (prepainted aluminum cap flashing, Kynar-finish scuppers and coping). The Base Bid covers 600 Hall at 19,620 square feet; Alternate Bid 1 covers the 600 Hall Addition at 10,080 square feet. Core sampling to determine insulation thickness is required at the pre-bid site visit, and all measurements are the contractor's responsibility. The contractor must provide unit pricing for three contingencies: deteriorated wooden nailer removal and replacement (per linear foot), deteriorated metal roof deck replacement (per square foot), and deteriorated fiberboard insulation replacement (per square foot).
Work must begin within 90 days of receipt of order, with a contract term from date of award through July 30, 2027, and an option for extension for two additional years at Onslow County Schools' discretion. The contractor must furnish a one-year workmanship warranty; the manufacturer provides a 20-year full value NDL warranty on the roofing system and a 10-year water tightness warranty. Insurance requirements include Worker's Compensation with $500,000 employer's liability minimum, Commercial General Liability of $1,000,000 combined single limit, and Automobile Liability of $500,000 combined single limit. The contractor is responsible for all permits, inspections, legal debris disposal, and compliance with E-Verify, Davis-Bacon Act provisions, debarment certifications, and non-discrimination requirements. Payment is net within 30 days of invoice receipt or goods acceptance, whichever is later. Onslow County Schools reserves the right to adjust quantities based on available budgeted funds and to award on a split order or lump sum basis.
Opportunity text
Removal of existing EPDM single ply membrane, existing metal trim down to existing insulation and fiberboard (if any) and the recovering of roof with new 3/8" gypsum core boards with fiberglass facer mat (Dens Deck ProFast Prime Roof boards, or equivalent and a new 60 mil, reinforced, smooth white, fully adhered TPO membrane roofing system with 20 year NDL manufacturer's warranty. Contractor is responsible for the legal disposal of all debris. The existing insulation and roof deck shall remain in place. Where there are existing roof drains, they are to remain, provide new bolts in the clamping, compression rings. Where the clamping, compression rings are damaged or broken, provide new cast iron clamping, compression rings with new cast iron domes. Plastic domes and retrofit-type drains are unacceptable. All metal trim, (coping, counter flashings, termination bars shall be new.) If there is epdm run up wall behind metal trim, we want TPO run up the same way. If that is not possible contact owner with an alternative. Metal cap flashing shall be prepainted aluminum. Provide a one-piece cap flashing with continuous cleats each side at the top of exposed parapet walls. Provision needs to be made for expansion and contraction. Metal cap flashing shall be in 10 Foot lengths unless shorter pieces are required. Gravel stops, perimeter edge (coping), counter flashings facia shall be formed of prepainted aluminum, 10-foot minimum sections, extending on roof not less than 4". Existing scupper locations shall be reused for new scuppers. All scuppers shall be replaced by prepainted Kynar finish matching existing gutters and coping metals. The cost of all required inspections and permits (opening and closing of permits) shall be the responsibility of the contractor. Upon completion of roofing work, contractor will furnish to the owner The Roofing Systems Manufacturer's 20 year (or longer) Full Value NDL Full System Warranty on materials and of the Roofing System, roofing, insulation, flashing and sheet metal work, 10 year water tightness warranty and a 2 year Contractors workmanship warranty (guarantee) against leakage and defects due to workmanship and / or negligence by contractor. When inspection is called for, owner shall be informed and on site when inspected by representative of roofing manufacturer.
Files
| File | Type | Posted |
|---|---|---|
| Northside High 600 Hall and 600 Hall Addition Reroof.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity