Non-Potable Water Pump Station Rehabilitation Project
Closed State & local contract opportunity Posted
- Solicitation number
- 26-SDNPWRP-1
- State
- New York
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- John Warmt jwarmt@saratogacountyny.gov (518) 885-2210
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Saratoga County Department of Central Services is requesting sealed bids for non-potable water pump station rehabilitation at the Saratoga County Sewer District, Mechanicville, New York, with bids due July 28, 2026 at 11:00 a.m. A pre-bid conference with site walk-through is scheduled for July 15, 2026 at 2:00 p.m. at the project site.
The scope encompasses demolition of five existing high-pressure non-potable water pumps and associated suction and discharge piping, bypass recirculation piping and valves, and equipment pads; installation of three new high-pressure pumps with associated piping, bypass recirculation systems, valves, and equipment pads; demolition and modification of suction and discharge header piping; installation of isolation gate valve on HP suction header and isolation butterfly valves on high-pressure and low-pressure discharge headers; installation of magnetic flow meters on both discharge headers; reinstallation of existing instrumentation panel and selective process valves; removal and reinstallation of HVAC ductwork; and demolition and capping of existing chlorine feed line. Selective existing valves and instrumentation will be retained and reused.
The contract is awarded on a lump-sum basis to the lowest responsive and responsible bidder. Substantial completion is required within 300 calendar days of Notice to Proceed, with final completion within 330 calendar days. Liquidated damages are $1,000 per day for delays beyond substantial completion, plus actual costs for owner engineering and inspection.
Bids must include a bid bond or certified check equal to five percent of the maximum bid price. The successful bidder must furnish 100% performance and payment bonds and demonstrate prior experience with comparable projects. All work is subject to New York State prevailing wage requirements. Bids must be registered holders of bidding documents through the Empire State Bid System. No bid may be withdrawn within 60 days of bid opening.
Opportunity text
The Work is located at the Saratoga County Sewer District, 1002 Hudson River Rd, Mechanicville, NY 12118. The Work consists of the following: Base Bid: Mobilization and demobilization. Demolition of existing high-pressure (HP) non-potable water pumps (total of 5 pumps), associated suction and discharge piping, bypass recirculation piping and valves, equipment pads, and associated appurtenances. Selective valves and instrumentation shall be kept and reused. Installation of 3 new high-pressure non-potable water pumps plus associated suction and discharge piping, bypass recirculation piping and valves, equipment pads, and associated appurtenances. Reinstallation of existing instrumentation panel with appurtenances and selective process valves. Demolition, modification, and installation of suction and discharge header piping for HP system required. Isolation gate valve to be provided and installed on HP suction header. Demolition and installation of magnetic flow meter and isolation butterfly valve on both high pressure and low pressure discharge header. Removal and reinstallation of part of HVAC ductwork will be required for access on low-pressure discharge header. Demolition and capping of an old chlorine line will be required for access on low-pressure discharge header.
Files
| File | Type | Posted |
|---|---|---|
| Non-Potable Water Pump Station Rehabilitation Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity