Neuse River Resource Recovery Facility BNR Basins MCC Replacement

Open State & local contract opportunity Posted

Solicitation number
274-BMC
State
North Carolina
Responses due

Opportunity facts

Jurisdictions

Opportunity details come from evp.nc.gov. Updated .

About this opportunity

The City of Raleigh is requesting sealed bids for demolition and in-kind replacement of motor control centers and programmable logic controller cabinets at the Neuse River Resource Recovery Facility, with bids due October 21, 2026 at 2:00 p.m. at the NRRRF Administration Building, 8500 Battle Bridge Road, Raleigh, North Carolina. A mandatory pre-bid meeting and site walk will be held October 6, 2026 at 11:00 a.m. at the same location.

Bidders must hold a North Carolina contractor's license with appropriate limitation and classification as required by North Carolina General Statute Chapter 87. Award will be made to the lowest responsible and responsive bidder, with consideration given to quality, performance, and time specified for contract performance.

The scope includes demolition and in-kind replacement of MCC-P4B, MCC-P5B, and MCC-P6B motor control centers; demolition and replacement of PLC-81, PLC-82, and PLC-83 cabinets; construction of a new prefabricated metal enclosure with walls, roof, doors, lighting, and HVAC system to house the new equipment; extension of the existing concrete foundation to accommodate the new enclosure footprint; and demolition and replacement of all power wire cable and corroded electrical conduit serving the six BNR Aeration Basins. Bid security of 5% of the bid amount must accompany each submission. Bids will be publicly opened and read aloud following the deadline. The City Council reserves the right to waive any informality or reject any or all bids. Bidding documents are available for examination at the engineer's office (Black & Veatch International Company) and through online platforms including ConstructConnect, McGraw Hill Dodge Company, Construction Journal, and the NC Institute of Minority Economic Development.

Opportunity text

Neuse River Resource Recovery Facility BNR Basins MCC Replacement: • Demolition and in-kind replacement of MCC-P4B, MCC-P5B, and MCC-P6B. • Demolition and replacement of PLC-81, PLC-82, and PLC-83 cabinets. • New prefabricated metal enclosure with walls, roof, doors, lighting, and HVAC system to house new MCC and PLC. • Extension of existing concrete foundation to accommodate new enclosure footprint. • Demolition and replacement of all power wire cable within existing conduit from each MCC to each motor and device on BNR Aeration Basins 1-6. • Demolition and replacement of sections of corroded electrical conduit from each MCC to each motor and device on BNR Aeration Basins 1-6.

Files

File Type Posted
274-BMC.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity