MWBE SDVOB Subcontractors
Closed State & local contract opportunity Posted
- Solicitation number
- 2137942
- State
- New York
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Scot Binder sb@iancc.com (718) 836-2000
Updated .
About this opportunity
Iannelli Construction Company, Inc., the prime contractor on a CUNY Lehman College mechanical systems renovation, is soliciting bids from NYS-certified M/W/SDVOB subcontractors for work at Carman Hall, 2790 Goulden Avenue, Bronx, New York, with subcontractor bids due September 21, 2026. The subcontracting opportunity carries mandatory participation goals: 6.00% Service-Disabled Veteran-Owned Business (SDVOB), 18.00% Minority Business Enterprise (MBE), and 12.00% Women Business Enterprise (WBE).
The scope is replacement of fan coils and unit ventilator units with new units featuring energy recovery, electronically commutated motors, and fresh air ventilation integrated into the campus-wide building management system. Associated work includes heat exchangers, water pumps with variable-frequency drives, dual-temperature water piping from risers to fan coils, new variable air volume duct systems, accessible ceiling replacement in corridors and perimeter rooms, flooring replacement where fan coils are removed, demolition, roofing, spray fireproofing, carpentry, resilient flooring, and painting. Labor is subject to the applicable Union Prevailing Labor Agreement. Interested subcontractors must contact Iannelli Construction at sb@iancc.com or (718) 836-2000 and include their email address.
Opportunity text
Iannelli Construction Company, Inc. has been awarded the above project and is seeking bids from NYS certifi ed M/W/SDVOB contractors for the renovation of CUNY Lehman College Unit Ventilator System Replacementand Associated AsbestosAbatement located at Lehman College- Carman Hall2790 Goulden Ave. Bronx NewYork 10468. The scope of work is to replace fan coils and unit ventilator units which have exceeded their life expectancy with new units that include energy recovery,EC motors and fresh air ventilation levels with controls for the mechanical systems that will integrate into the campus-wide BMS system. Heat exchangers,water pumps equipped with VFDs,and dual temperature water piping from the risers to the FCs are also part of the scope. To facilitate the new VAV duct systems andthe new FCUs on the affected floors, new accessible ceilings in corridors and in some perimeter, rooms will be specified for replacement of existing ceilings. Wherefan coils are being removed, the flooring will be replaced to avoid unsightly patch. Work includes but is not limited to Demolition, Roofing, Spray Fireproofing, Carpentry, Resilient flooring, and Painting. Labor for the project is subject to the Union PLAAll interested firms should contact us via email at sb@iancc.com or call our office at(718)836-2000. Please include your email address.Iannelli Construction Company, Inc is an Equal Opportunity Employer Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 18.00% WBE Goal: 12.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00%
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity