About this opportunity
Cameron County is seeking construction bids for two regional detention ponds near Primera, Texas under TWDB FIF Project No. 40073, with proposals due September 30, 2026.
The scope encompasses construction of two detention ponds with concrete weir outfall structures and stone riprap protection; low-flow pipe outlets with headwalls and check valves; minor channel grading; installation of culverts under the Union Pacific Railroad via jack-and-bore method; and concrete riprap headwalls for slope protection. Coordination with UPRR is required for all work within UPRR right-of-way. The project includes erosion and sedimentation control measures and revegetation of disturbed areas.
No estimated contract value, contract term, evaluation criteria, pre-bid meeting, or question deadline is specified in the source.
Opportunity text
The work generally consists of the construction of two (2) regional detention ponds located near Primera, TX. The ponds will include concrete weir outfall structures with stone riprap protection, as well as low flow pipe outlets with headwalls and check valves. Additional work includes minor channel grading as well as installation of additional culverts under the Union Pacific Railroad (UPRR) via jack and bore and construction of concrete riprap headwalls for slope protection. Coordination with the UPRR will be required for all work in UPRR ROW. Erosion and sedimentation control measures will be required along with revegetation of disturbed areas.