About this opportunity
The San Francisco Public Utilities Commission (SFPUC) is issuing a Request for Qualifications (RFQ) to identify qualified applicants for the HH-1018 Moccasin Powerhouse Bypass Upgrade project, with qualifications responses due October 22, 2026. This is a pre-qualification stage; selected applicants will be invited to respond to a subsequent Request for Proposals.
The project addresses chronic vibration and cavitation damage to the existing bypass valve system at the Moccasin Powerhouse, part of SFPUC's water delivery infrastructure originating at Hetch Hetchy Reservoir and serving the San Francisco Bay Area. The bypass system diverts water around two hydroelectric turbines during periods when electricity generation is not required or when equipment requires maintenance and repair. The system operates at approximately 560 pounds per square inch and can convey up to 305 million gallons per day. Historical operation beyond two to five days has resulted in significant mechanical damage; extended operation risks severe valve failure. The project scope involves construction to upgrade or replace the bypass system to eliminate or mitigate these failure modes.
The source does not specify contract value, budget range, contract term, place of performance, evaluation criteria, or a pre-proposal meeting date. No incumbent contractor is identified. Qualified applicants selected through this RFQ stage will receive the detailed RFP containing specifications, requirements, timelines, and pricing instructions.
Opportunity text
The San Francisco Public Utilities Commission (SFPUC) is issuing this Request for Qualifications (RFQ) in search of Applicants with the specified qualifications to respond to the forthcoming Request for Proposals (RFP) to construct the HH-1018 Moccasin Powerhouse Bypass Upgrade project (Project). An Applicant is any entity responding to this RFQ. Water deliveries for the San Francisco Public Utilities Commission (SFPUC) originate at Hetch Hetchy Reservoir and travel through Early Intake Dam to the beginning of the Mountain Tunnel, which extends more than 18 miles. After passing through the Mountain Tunnel, water enters Priest Reservoir and continues through the Moccasin Power Tunnel to the Moccasin Penstocks. At the West Portal Valve House, located at an elevation of 2,116 feet above mean sea level (MSL), water enters the Moccasin Penstocks and descends approximately 1,200 feet to the Moccasin Powerhouse (MPH). At MPH, water passes through two hydroelectric turbines where the energy of high-pressure water is converted into electricity. When electricity generation is not required or turbine/generator units are down for repairs or maintenance, water is diverted around the turbines through two existing bypass valves capable of dissipating up to 143,000 horsepower of hydraulic energy. The bypass system can convey up to 305 million gallons per day (mgd) at pressures of approximately 560 pounds per square inch (psi). After passing through MPH, water enters either Moccasin Reservoir or the Moccasin Reservoir Bypass Pipeline before continuing through the Foothill Tunnel to the San Joaquin Pipelines (SJPLs) and ultimately serving customers throughout the San Francisco Bay Area. Historically, periodic short-term operation of the bypass system has resulted in significant vibration and cavitation damage to the high-pressure energy-dissipating valves. Extended operation of the bypass valves (greater than two to five days) could lead to severe mechanical damage or valve failure, potentially interrupting critical water deliveries to San Francisco. The objective of the MPH Bypass Upgrades Project is to upgrade or replace the high-pressure energy-dissipating valves, control systems, and associated structures to provide a reliable hydraulic bypass system around the turbines and directly to the Moccasin Reservoir Bypass Pipeline