Miami-Dade County's Aviation Maintenance Department is requesting sealed bids for installation of adult changing stations and renovation of two public restrooms (DC29134 and H20516) at Miami International Airport under RPQ No. AC013A, with bids due August 26, 2026 at 2:00 p.m., a mandatory pre-bid Microsoft Teams meeting on August 11 at 10:00 a.m., and a mandatory site visit on August 13 at 10:00 a.m.
The scope includes selective interior demolition, new partition walls, new toilet and lavatory fixtures, new tile finishes (floor and wall), grab bar installation, toilet paper dispensers, hand dryers, faucets, finish paint, and electrical work for light fixture replacement. Work must comply with MCC 7360 General Contract Conditions, all required permits and inspections, and applicable federal, state, and local codes. The contractor must hold a valid General Building Contractor license and demonstrate a minimum of five years of experience in their specific trade with a minimum average contractor performance evaluation score of 3.0.
The estimated contract value is $246,951 (excluding contingencies and dedicated allowances), submitted as a lump sum on the MCC-7360 Attachment 5A Bid Form. The contract includes a mandatory 10% Contingency Allowance Account and a fixed $40,000 Dedicated Allowance Account. Bids must be accompanied by a bid bond, certified check, or cashier's check. The selected contractor must provide a Performance and Payment Bond for the full contract amount within ten working days of recommendation for award. Commercial General Liability insurance of $300,000 per occurrence and $600,000 aggregate is required; work on Aircraft Operating Airside requires $5,000,000 minimum coverage.
The anticipated project start date is November 16, 2026, with a 180-calendar-day completion schedule. Liquidated damages are assessed at $309.47 per calendar day for delays beyond substantial completion. The project is not subject to Davis-Bacon wage requirements, DBE participation goals, or SBE set-asides. Award will be made to the lowest responsive and responsible bidder.
Opportunity text
Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials for the installation of adult changing stations and renovation of public restrooms DC29134 and H20516 including: selective interior demolition, new partition walls, new toilet fixtures, new tile finishes (floor and wall), new lav. plumbing fixtures, new plumbing fixtures (no change in the amount of existing plumbing fixtures), installation of the grab bar, toilet paper dispenser, hand dryer, faucets, finish paint, and electrical work required for the light fixture replacement. CONTRACTOR shall review all documents, specifications, and scope of work provided by MiamiDade Aviation Department (MDAD) for work to be completed. Please refer to the Plans & Technical Specifications for further description of the scope of work. Contractors must agree to perform all work in accordance with the scopes of work established by MDAD, the MCC 7360 contracts terms and conditions, all required permits and inspections and all applicable federal, state and local laws, codes and regulations. For the MCC 7360 General Contract Conditions, refer to the following link: https://intrax.miamidade.gov/ciis/TheAmendedStandardConstructionGeneralContractConditions.pdf Any minor variation in the scope of work that is necessary to complete the intended work shall be considered incidental and will not warrant additional compensation. Any major variation encountered in the scope of work that is necessary to complete the intended work will be additional work and will be compensated through a contingency allowance account, dedicated allowance account, or change order. However, such major variation shall be completed without delay. Contractor shall use an adequate number of qualified workers who are thoroughly trained in the techniques required to properly complete the work specified. Contractor will own or have access to the equipment necessary and to meet all safety, insurance, and technical requirements of the owner and local, county, state, and federal regulating authorities. The grand total bid price shall be reflected on the RPQ Bid Form Attachment 5A.
Files
| File | Type | Posted |
|---|---|---|
| miami-dade RPQ_No_AC013A.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity