Mauldin Road Clarifier Launder Concrete Preparation and Coating Services
Closed State & local contract opportunity Posted
- Solicitation number
- 145756
- State
- South Carolina
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Ronshica Montgomery ronshicam@re-wa.org (864) 299-4000
Opportunity details come from vendors.planetbids.com. Updated .
About this opportunity
Greenville County, South Carolina is requesting proposals for concrete preparation and coating services on the Mauldin Road Clarifier Launder, with proposals due September 16, 2026. A pre-proposal meeting was held September 8, 2026 and was attended by ten companies, indicating active market interest.
The scope covers abrasive blasting to remove previous coatings from clarifier launder troughs, vacuum removal of spent abrasives, pressure washing to eliminate mildew and algae, and mortar patching to repair pit holes and exposed aggregate. Vendors must submit separate cost quotations for two scenarios: resurfacing two clarifiers and resurfacing all four clarifiers. All work must be completed by December 31, 2026. Record drawings (designated S11.1 R and S11.2 R) are provided as reference documentation for site conditions, dimensions, and structural details.
The procurement documents do not specify estimated contract value, contract term, set-aside or preference programs, incumbent contractor information, or detailed evaluation criteria. Place of performance is the Mauldin Road facility in Greenville County, which appears to be a wastewater treatment facility based on the clarifier launder scope.
Opportunity text
The purpose of this solicitation is to prepare and rehab concrete in the final clarifier launder troughs. Vendor should quote cost for prepping and resurfacing two of the clarifiers as well as a cost for resurfacing all four clarifiers. Vendor should abrasively blast lauders to remove remnants of previous coatings and vacuum all spent abrasives out of launder. Vendor should pressure wash to remove any mildew, algae, and residue from the clarifier launder before starting coating application. Vendor must patch clarifier launders with mortar to fix pit holes and exposed aggregate. The entire Work is to be completed by December 31, 2026.