About this opportunity
The City of Union City, California is requesting bids for replacement of existing air handler units AC 1 and AC 2 at Mark Green Sports Center (31224 Union City Blvd) under an IFB, with bids due June 16, 2026 at 2:00 p.m. PST and a mandatory pre-bid job walk on June 2, 2026 at 10:00 a.m. PST.
The scope is removal and replacement of HVAC equipment. Project completion is allotted at 65 working days. The Engineer's Estimate for the project base is $203,000. Interested bidders must email joseph.harrington@cumming-group.com to be added to the pre-bid walk attendee list.
Bid packages are available at no charge from the City's Public Works Department at publicworks@unioncity.org. Complete bid documents, including the Notice of Inviting Bids and the Mark Green HVAC Replacement Request for Bid, are available through the City's website at https://www.unioncityca.gov/bids.aspx.
Joseph Harrington is the primary contact at (650) 241-2390 or joseph.harrington@cumming-group.com. The City of Union City's Public Works Department is managing the procurement.
Opportunity text
3 versions
Update #3 · Latest ·
The City of Carson is soliciting bids from experienced and qualified contractors to furnish all labor, supervision, equipment, materials, tools, transportation, and incidentals necessary to provide mowing and landscape maintenance services at various City-owned parks and facilities. Services include, but are not limited to, mowing, edging, string-trimming, blowing, and related turf and landscape maintenance in accordance with the specifications and Scope of Work contained in this Invitation for Bids.
Update #2 ·
The project primarily consists of replacement of existing air handler units AC 1 and AC 2 at Mark Green Sports Center located at 31224 Union City Blvd in Union City, California
Update #1 ·
The project work requiring architectural design services include: A renovation and redesign of the multi-occupancy, multi-gendered restroom to satisfy ADA requirements. The facilities shall include two (2) standard stalls and one (1) ADA accessible stall, in addition to a communal sink area. The existing storage closet can be demoed to allow additional space for the facilities. Sewer piping will need to be removed and replaced to rid the current system of any corroded or piping in unacceptable condition. Renovation and redesign of the private restroom near the west entrance of the station. The restroom is to be widened to allow additional space for occupants. Sewer piping will need to be removed and replaced to rid the current system of any corroded or piping in unacceptable condition. Existing walls separating the private office from the communal work area shall be demolished. Wall and windows separating the active police communal work area and the front entrance area shall be demolished and rebuilt to exclude any windows and a more secure door. Walls for existing front counter office, opposite the main entrance, shall be demolished, along with counters. New partition with access doors to be constructed. New HVAC units, including any accommodations to ensure structural integrity of existing roof will not be compromised, including new ducting in area of proposed upgrades. New ACT ceiling below existing ceiling. Convert existing COATS ROOM into coffee bar area and demo existing wall separating room from communal work area. Update electrical subpanel to assist in accommodating additional loads. Other cosmetic and construction work to be performed not requiring architectural design or input include: Abatement (ceiling, floors, and walls). Prepping, priming, and painting existing walls within limits of work. Removing and replacing existing floors with Luxury Vinyl Tile (LVT) within limits of work. Embed all wall mounted electrical within limits of work. Removing and replacing all lighting within limits of work. Removing all of the cubicles and desks and replacing them with units chosen by the City.