About this opportunity
Renewable Water Resources (ReWa), a special purpose district in Greenville County, South Carolina, is requesting bids for streambank stabilization and restoration along the Reedy River adjacent to existing sanitary sewer infrastructure, with bids due July 28, 2026 at 2:00 PM via the ReWa PlanetBids portal. The project is subject to Davis-Bacon wage standards, American Iron and Steel provisions, and Equal Employment Opportunity mandates due to potential State Revolving Fund (SRF) or federal grant/loan funding through the South Carolina Department of Environmental Services or EPA.
Work scope includes removal of existing structures and debris, installation of approximately 194 linear feet of boulder toe wall and two in-stream boulder vanes, grading and bank restoration, earthwork (500 cubic yards), coir matting installation (563 square yards), sediment and erosion control implementation, and permanent revegetation. The project is located in Simpsonville, South Carolina.
Pricing is submitted as a lump sum bid with line items provided for informational purposes only; all bids must include sales tax and applicable fees. Bids exceeding $100,000 require a five percent bid bond. The successful contractor must provide Performance and Payment Bonds each equal to 100 percent of the contract price. Project completion is 120 consecutive calendar days from Notice to Proceed, with substantial completion required at 90 days; liquidated damages apply for delays beyond these milestones.
Contractors must hold South Carolina Contractor's Licensing certification and comply with the South Carolina Illegal Immigration Reform Act and E-Verify requirements. A two percent withholding applies to nonresident contractors whose South Carolina contract portion exceeds $10,000, unless proof of bond is provided.
A non-mandatory pre-bid conference and on-site visit are scheduled for July 21, 2026 at 2:00 PM at the Lower Reedy WRRF facility. The project engineer is Ardurra Group, Inc., located in Greenville. Award is anticipated within 90 days of bid opening.
Opportunity text
The Lower Reedy WWRF Streambank Stabilization includes restoration and stabilization of an eroded section of streambank along the Reedy River adjacent to existing sanitary sewer infrastructure. Work includes removal of existing structures and debris, installation of approximately 194 LF of boulder toe wall and two in-stream boulder vanes, grading and restoration of the washed-out bank, and implementation of sediment and erosion control measures. Disturbed areas and newly constructed slopes will be revegetated to provide final stabilization and reduce the potential for future erosion.