Lighting Vault Docking Station - West Airfield
Open State & local contract opportunity Posted
- Solicitation number
- AVIA 27-04
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Drew Buckner andrew.buckner@cltairport.com (704) 359-4013
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The State of North Carolina is soliciting bids for installation of a generator docking station at the West Airfield Lighting Vault, with proposals due October 29, 2026.
The scope includes construction of a concrete equipment pad, connection of an owner-furnished generator docking station to the existing standby power system ahead of the existing transfer switch, modification of the standby power system, installation of new feeders, conduits, grounding, and control wiring, interior lighting upgrades, replacement of exit signs, and testing, startup, commissioning, cleanup, and site restoration. The contractor shall provide all labor, supervision, equipment, tools, transportation, miscellaneous materials, permits, inspections, and testing required for completion. The work is located at West Airfield, serving both Mecklenburg County and Cleveland Town jurisdictions in North Carolina.
No contract value, contract term, set-aside or preference program, incumbent contractor, evaluation criteria, pre-bid meeting, question deadline, or award timeline is identified in the posted materials.
Opportunity text
The Contractor shall provide all labor, supervision, equipment, tools, transportation, miscellaneous materials, permits, inspections, testing, and incidentals required to complete the installation of an Owner-furnished Generator Docking Station at the West Airfield Lighting Vault. The Lighting Vault is currently equipped with an existing diesel generator without temporary power connections. The docking station must be connected to the existing standby power system ahead of the existing transfer switch. The work includes, but is not limited to:
- Installation of the owner-furnished generator docking station.
- Construction of the concrete equipment pad.
- Modification of the existing standby power system.
- Installation of new feeders, conduits, grounding, and control wiring.
- Interior lighting upgrades.
- Replacement of exit signs.
- Testing, startup, commissioning, cleanup, and restoration.
Files
| File | Type | Posted |
|---|---|---|
| Airfield West Lighting Vault Docking Station.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity