Lift Station No. 73 Rehabilitation Project
Closed State & local contract opportunity Posted
- Solicitation number
- ITB-033-26-0-2026/AM
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Ayesha Mohammed amohammed@plantation.org (954) 797-2226
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Plantation is requesting bids for the replacement and rehabilitation of Lift Station No. 73 under ITB, with proposals due August 25, 2026 at 11:00 a.m. Eastern Time. Mandatory pre-bid and site visits are scheduled for August 12 and August 19, 2026, both at 10:00 a.m. at 1331 NW 73rd Avenue, Plantation, Florida.
The scope encompasses demolition of the existing drywell and all equipment, conversion of the existing wet-well to a manhole, installation of an additional manhole, wet-well, valve vault, new pumps, piping, valves, fittings, and electrical equipment, connection to the existing forcemain, new electrical service and equipment, tree removal, and miscellaneous demolition. The contractor must furnish all labor, materials, equipment, services, coordination, and incidentals. Maintenance of all utility services, including sanitary service, is mandatory throughout the construction period. Work must be performed in full accordance with the plans, specifications, terms, and conditions contained in the bid documents.
Bid submissions are administered through eBidding via DemandStar. The source does not specify estimated contract value, contract duration, incumbent contractor, bid bond requirements, or evaluation criteria. Blueprints are not currently associated with the bid package; they may be released in an addendum or available at the pre-bid meeting.
Opportunity text
The City is requesting proposals for the replacement of the existing Lift Station #73 in the City of Plantation. The Work set forth within these bid/proposal documents includes the furnishing of all labor, materials, equipment, services, coordination and incidentals for demolishing the existing drywell and all equipment, converting the existing wet-well to a manhole, installing an additional manhole, wet-well, valve vault, new pumps, piping, valves, fittings, and electrical equipment, connection to existing forcemain, new electrical service and equipment, tree removal, miscellaneous demolition, and all other work shown on the Drawings. Maintenance of all utility services, including sanitary service, is mandatory throughout the construction period.. The work shall be performed in full accordance with the plans, specifications, terms, and conditions contained in this Invitation to Bid.
Files
| File | Type | Posted |
|---|---|---|
| plantation Lift Station No. 73 Rehabilitation Project - DemandStar.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity