Lift Station No. 4 Replacement

Open State & local contract opportunity Posted

Solicitation number
ITB-2027-01-0-2027/AM
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Wilton Manors, Florida is requesting bids from qualified licensed contractors for replacement of Lift Station No. 4 under ITB, with bids due November 10, 2026 at 11:00 a.m. EST.

The scope requires furnishing and installing all tools, equipment, materials, supplies, labor, transportation, fuel, power, water, and communications necessary for complete lift station replacement in strict accordance with contract documents. Contractors are responsible for providing any additional work, materials, and services necessary for proper construction at no increase in cost to the City. The bid package includes comprehensive technical documentation: bid set plans (15.33 MB), technical specifications (2.23 MB), HDD pressure calculations (638.38 KB), general construction specifications (458.14 KB), and WIFIA specifications (2.33 MB). A bid bond is required for submission.

Six plan holders have registered: FLOVAC, INC; JBrown Professional Group Inc.; Miami Pump and Supply; Pimentel Construction Group; SanPik; and one additional entity. Plan documents are available in electronic format via DemandStar for electronic download. No pre-bid conference is scheduled. The project is assigned commodity codes related to public utilities maintenance and repair services, sewer and storm drain construction, and water and sewer equipment rental or lease.

Opportunity text

The City of Wilton Manors, Florida (City) is seeking bids from qualified licensed CONTRACTORs (CONTRACTOR) for the replacement of Lift Station No. 4. The work to be performed under this Contract shall consist of furnishing and installing all tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The work shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the WORK in good faith shall be provided by the CONTRACTOR as though originally so indicated, at no increase in cost to the CITY.

Files

File Type Posted
wilton manor OpenBids-DemandStar.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity