Kentmere Lift Station Modifications and Force Main Design
Closed State & local contract opportunity Posted
- Solicitation number
- 26-68-3320
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Greg Bridges gebridges@forsythco.com (770) 888-8872
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Forsyth County Board of Commissioners is soliciting bids for construction services on the Kentmere Lift Station Modifications and Force Main Design project, with bids due July 2, 2026.
The scope comprises three major components: modifications to the existing Kentmere Lift Station pump control logic and wetwell control elevations, including installation of two wetwell float switches; installation of two new flow meter vaults with associated 6-inch and 8-inch magnetic flow meters, actuated plug valves, yard piping, valves, and controls; and approximately 20 linear feet of 8-inch ceramic epoxy lined ductile iron pipe (DIP) at the lift station site, 2,130 linear feet of 6-inch ceramic epoxy lined DIP force main, and 265 linear feet of 8-inch polyvinyl chloride (PVC) gravity sewer pipe with associated manholes, valves, and appurtenances.
The attached solicitation document does not specify estimated contract value, contract term, place of performance, pre-bid meeting or site-visit dates, question deadlines, set-asides or preference programs, incumbent contractor, evaluation criteria, or anticipated award date. Bidders should obtain the full invitation for bids, instructions to bidders, and detailed contract specifications directly from Forsyth County.
Opportunity text
The Forsyth County Board of Commissioners is soliciting bids from qualified firms to provide Construction services for the Forsyth County Kentmere Lift Station Modifications and Force Main Design including the following major components: 1. Modifications to the existing Kentmere Lift Station pump control logic and wetwell control elevations, including the installation of two wetwell float switches. 2. Installation of two (2) new flow meter vaults with associated two (2) new magnetic flow meters (6- inch and 8-inch), one 6-inch and one 8-inch actuated plug valves, new yard piping and valves, and associated controls. 3. Approximately 20 linear feet of 8-inch ceramic epoxy lined ductile iron pipe (DIP) at the lift station site, 2,130 linear feet of 6-inch ceramic epoxy lined DIP force main and 265 linear feet of 8-inch polyvinyl chloride (PVC) gravity sewer pipe with associated manholes, valves, and appurtenances.
Files
| File | Type | Posted |
|---|---|---|
| Forsyth County Georgia.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity