KBH Sixth Skid Expansion Project

Closed State & local contract opportunity Posted

Solicitation number
CSP16-26
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

El Paso Water Utilities-Public Service Board (EPWU-PSB) is requesting sealed proposals for the KBH Sixth Skid Expansion Project (CSP 16-26), a water treatment plant equipment installation and construction project, with proposals due September 2, 2026 at 1:30 p.m. Mountain Time and a pre-proposal meeting on August 5, 2026 at 10:00 a.m. via Teams.

The scope encompasses furnishing and installing a third sand strainer unit with control panel, replacing two existing sand strainer control panels, monorail and crane systems for strainer removal, a seventh cartridge filter vessel, a sixth reverse osmosis (RO) skid feed pump, a sixth RO skid with three million gallon per day permeate production capacity including frame, membrane vessels, membranes, interstage booster pump, valves, instruments and accessories, new monorail and crane in the Process Building, variable frequency drives for RO feed and interstage booster pumps, replacement sodium hydroxide and corrosion inhibitor feed pumps, an RO feed bypass vault with flow meter and valves, an additional corrosion inhibitor bulk storage tank, raw water bypass piping with motorized isolation valves, and miscellaneous site and yard piping improvements. Work location is El Paso, Texas.

Minimum qualifications include at least one completed drinking water treatment plant project where the facility remained operational during construction, key personnel with water treatment experience, vertical turbine pump installation experience of 350 horsepower or greater on at least two municipal projects within the last ten years, and a qualified Master Electrician. Prevailing wage requirements apply. The work is partially funded by the United States Bureau of Reclamation and is subject to Buy America Build America Act requirements for non-manufactured products.

Evaluation uses best-value selection: financial capacity (pass/fail), offeror's water treatment plant experience (0–24 points), team experience (0–36 points), project approach (0–30 points), and total proposal price (0–50 points), for a maximum of 140 points. The successful offeror must furnish 100 percent performance and payment bonds and acceptable insurance certificates. Proposal security of 5 percent of the maximum proposal price is required. Sealed proposals must be submitted electronically via EUNA Procurement-IonWave or as three hard copies to 1154 Hawkins Boulevard, El Paso, Texas 79925. Proposals will be opened and read aloud at 2:00 p.m. on September 2, 2026 via Microsoft Teams. An EPWU Cone of Silence policy prohibits communication regarding proposals between offerors and EPWU Board Members or Staff except through designated purchasing personnel or formal written addenda via IonWave.

Opportunity text

The Work of the KBH Sixth Skid Expansion" project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Furnish and install a third sand strainer unit with control panel and replace control panels of two (2) existing sand strainer units. 2. Furnish and install monorail and crane at the existing sand strainer station to remove strainer unit covers. 3. Furnish and install a seventh cartridge filter vessel. 4. Furnish and install a sixth reverse osmosis (RO) skid feed pump. 5. Furnish and install a sixth RO skid of three (3) million gallon per day (mgd) of permeate production capacity, including skid frame, RO membrane vessels, RO membranes, interstage booster pump, valves, instruments, and accessories as specified. 6. Furnish and install new monorail and crane in Process Building above the existing RO skids and the new RO skid to lift up and mobilize the interstage booster pumps. 7. Furnish and install variable frequency drives (VFDs) of RO feed pump and RO interstage booster pump in Process Building's electrical room. 8. Replace the sodium hydroxide and corrosion inhibitor chemical feed pumps with new larger pumps. 9. Furnish and install vault with flow meter and valves for RO feed bypass pipeline. 10. Furnish and install one (1) additional corrosion inhibitor bulk storage tank in expanded concrete containment area. 11. Furnish and install raw water bypass line with motorized isolation tune-up valves. 12. Furnish and install all miscellaneous site and yard piping improvements and other improvements shown on the Drawings and Specifications.

Files

File Type Posted
CSP16-26 - Front Ends and Specs.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity