JPP Golf Learning Center Driving Range - Lighting Upgrade
Closed State & local contract opportunity Posted
- Solicitation number
- IFB-410-P-2024-006269-1
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Diana Del Rio Cabrera ddelriocabrera@pbc.gov (561) 233-0114
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Palm Beach County Board of County Commissioners' Facilities Development & Operations Department is requesting quotes for lighting and electrical upgrades at JPP Golf Learning Center Driving Range (4754 S. Congress Ave., Lake Worth Beach, Florida) under IFQ P-2024-006269, with quotes due October 1, 2026 at 2:00 p.m. and a mandatory pre-bid meeting on September 2, 2026 at 10:00 a.m. A 10% price preference is available to certified Small Business Enterprises (SBEs) whose bids are within 10% of the lowest non-SBE bid.
Contractors must be qualified under Palm Beach County's Annual Contract for Electrical Services and submit qualification applications at least ten days prior to the bid due date. The scope encompasses furnishing all labor, equipment, materials, transportation, professional services, supervision, drawings, and permitting to complete lighting and electrical upgrades per engineering drawings and specifications in Exhibit 1. All materials must meet or exceed the Florida Building Code and be installed in strict accordance with manufacturer instructions. Work must be substantially completed within 180 calendar days from Notice to Proceed, Monday through Friday, 7:00 a.m. to 5:00 p.m. Contractors must submit a construction schedule for approval prior to the pre-construction meeting and coordinate space and security requirements with the Project Manager. Contractors are responsible for site preparation, cleanup, and restoration of any damage caused during construction, including landscaping and irrigation.
For bids of $200,000 or more, bid security (minimum 5% of bid price) and public construction bonds (100% of contract amount) are required. Liquidated damages are assessed at $120 per day for failure to achieve substantial completion within the specified timeframe. Contractors must warrant all equipment, materials, and labor against defects for twelve months from substantial completion. SBD program requirements apply, including submission of SBD schedules documenting all subcontractors and SBE participation.
Opportunity text
The work covered by this Request for Quote consists of the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting, and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work. To perform lighting and electrical upgrades per the project requirements provided below: a. Work to be completed per the engineerings drawings and specifications provided in Exhibit 1. a. All material shall meet or exceed Florida Building Code and product submittals shall be reviewed and approved by the Owners Representative prior to ordering. b. Materials shall be delivered in their original, unopened packages, and protected from exposure to the elements. Damaged or deteriorated materials shall not be used. Contractor is to coordinate all space and security requirements with the Project Manager. A construction schedule shall be submitted for review and approval prior to pre-construction meeting, including a start date, substantial completion date, and work plan defining which openings will be scheduled on what day. The Contractor shall conduct all work so as to cause the least interference possible with the normal activities of the operations of the facility and surrounding areas. Any damage caused by Contractor (including landscaping and irrigation) shall be the responsibility of the Contractor to repair and return to its original state. Report to the Project Manager, in writing, any imperfections, unacceptable conditions and/or corrections required to be made before commencing work. Any items not identified, documented and reported to Palm Beach County (PBC) in writing, will Page 3 of 3 become part of the contractors scope. All other items identified in writing, if approved, shall result in a change order. All materials shall be installed in strict accordance with Manufacturers written instructions and recommendations. All work shall be done in conformance with applicable Federal, State and Local codes, and established standards. Contractor warrants all equipment, materials and labor furnished or performed against defects in design, materials and workmanship for a period of twelve (12) months from substantial completion. Remove all waste materials, tools and equipment from job site daily. Thoroughly clean the entire job area prior to requesting final inspection.
Files
| File | Type | Posted |
|---|---|---|
| palm beach P-2024-006269 IFQ no plans.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity