Jennifer Branch Relief Sewer Consent Decree

Open State & local contract opportunity Posted

Solicitation number
20127 SX0
State
Maryland
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Baltimore County, Maryland is requesting bids on the Jennifer Branch Relief Sewer Consent Decree project, with proposals due November 5, 2026. The scope encompasses construction of approximately 5,188 linear feet of 15-inch polyvinyl chloride pipe sewer main, 1,088 linear feet of 16-inch ductile iron pipe sewer main, 35 pre-cast concrete sanitary sewer manholes totaling approximately 424 vertical feet, approximately 390 linear feet of 36-inch steel pipe installed via trenchless methods, and approximately 50 linear feet of 48-inch liner plate tunnel via trenchless methods. Work also includes mobilization, clearing and grubbing, forest conservation, demolition if required, flow control and bypass pumping, testing, traffic control, excavation, shoring, dewatering, backfill, base and surface pavement replacement, landscaping and restoration of all disturbed surfaces, wetland and buffer restoration, and demobilization.

Opportunity text

20127 SX0: Jennifer Branch Relief Sewer Consent Decree. Work includes, but is not limited to; mobilization; clearing and grubbing; forest conservation; demolition if required; flow control and bypass pumping; construction of approximately 5,188 linear feet of 15 inch polyvinyl chloride pipe sewer main; 1,088 linear feet of 16 inch ductile iron pipe sewer main; construction of 35 pre-cast concrete sanitary sewer manholes totaling approximately 424 vertical feet; construction of approximately 390 linear feet of 36 inch steel pipe (via trenchless methods); construction of approximately 50 linear feet of 48 inch liner plate tunnel (via trenchless methods); testing; traffic control; all related excavation, shoring, dewatering, backfill; base and surface pavement replacement; landscaping and restoration of all disturbed surfaces; wetland and buffer restoration; demobilization.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity