J. E Smith Library – Chiller Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- ECSU 2027-200 / ECSU 2026-02
- State
- Connecticut
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Kate Rotella rotellac@easternct.edu (860) 465-5148
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Eastern Connecticut State University's J.E. Smith Library in Willimantic is soliciting bids for removal and replacement of roofing, roof drainage, structural steel support framing, and rooftop-mounted air-cooled chillers with associated hydronic pumps, motor controllers, power and control wiring, with bids due August 4, 2026 and substantial completion required by May 1, 2027. A 25% Connecticut Registered Small Business Set-Aside subcontractor participation requirement applies, with 25% of that set-aside dedicated to woman- or minority-owned businesses; general contractors must also perform not less than 30% of the work with their own forces.
Prequalification is required as a General Building Construction contractor (Group "C"), Mechanical (HVAC) contractor, or Structural (Iron, Structural & Misc. Metal) contractor under Connecticut General Statutes Section 4a-100. The estimated project cost does not exceed $3 million. Construction commences on or before September 23, 2026, with key milestones including submission of drawings and equipment orders by October 30, 2026; removal of the existing chiller and structural frame by January 14, 2027; completion of structural frame and roofing work by April 1, 2027; and chillers installed and operational by April 15, 2027. Liquidated damages are assessed at $300 per calendar day for schedule failures.
Bidders must hold bid prices for 60 days, submit a 10% bid bond or certified check, and provide 100% performance and labor/material bonds upon award. The project is subject to Connecticut prevailing wage requirements under General Statutes Section 31-53, with certified monthly payroll submissions required. Bids must include compliance documentation including Form 1 (Gift and Campaign Contribution Certification), Form 5 (Consulting Affidavit), Form 6 (OPM Ethics), Form 7 (OPM Iran Certification), Bidder Contract Compliance Monitoring Report, W-9, and vendor forms. The contract is subject to Connecticut Executive Orders No. Three, Sixteen, and Seventeen regarding nondiscrimination, nonviolence, and labor recruitment.
Opportunity text
Removal and replacement of the existing roofing and roof drainage systems serving flat roof section of the Chiller Mezzanine Area. Removal & replacement of existing structural steel support framing serving chiller(s). Removal and replacement rooftop mounted air-cooled chillers, hydronic pumps, motor controllers, power and control wiring including associated controls. Prequalification Classification Requirements: GC - General Building Construction - Group "C"; SUB - Mechanical (HVAC) Contractor; SUB - Structural )Iron, Structural & Misc. Metal) Contractor.
Files
| File | Type | Posted |
|---|---|---|
| JE Smith Lib Chiller Rep 2026-02 Project Manual.pdf |