ITB 2025.06 - (C) Russell Harber Dock - Bid Form.pdf
PDF 20 KB Posted
- Attached to
- ITB 2025. 06 Russell Harber Dock Replacement State and local contract opportunity
- Solicitation number
- 2025.06
- Issued by
- Santa Rosa County, Florida
About this file
This document is a bid form for the Russell Harber Landing Hurricane Sally Storm Damage Repairs project for the City of Milton, Florida, associated with FEMA Project 160536. The project involves comprehensive dock repair and replacement, including mobilization, erosion control, removal of existing timber piles, installation of new 50-foot composite piles, floating dock construction, and riprap restoration. The bid form details 13 specific line items for the dock repair, including 6 new dock piles, a new 6.5-foot wide by 60-foot long floating dock, 10 aluminum cleats, and associated materials like geotextile fabric and bedding stone.
The bid form specifies that all costs are to be considered in-place costs, encompassing materials, hardware, shipping, fabrication, labor, equipment, insurance, bonds, permits, state and local taxes, overhead, and profit. While no specific pricing is filled in on the form, the document is structured to allow bidders to provide unit costs for each specified item. The project appears to be a post-Hurricane Sally recovery effort, with mitigation-focused reconstruction of the Russell Harber Landing dock facility. The document is dated 4/30/2025 and prepared by AMI Consulting Engineers PA, indicating this is a planned future infrastructure restoration project.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| ITB 2025.06 - (B) Russell Harber Dock - Planset.pdf | ||
| ITB 2025.06 - (A) Russell Harber Dock - AMI Specifications.pdf | ||
| ITB 2025.06 Russell Harber Dock Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Russell Harber Landing Hurricane Sally Storm Damage Repairs City of Milton, Florida
FEMA PROJECT 160536
System Item Type Unit Qty Cost per Unit TOTAL COST
1.01 Mobilization / Demobilization Assumes barge equipment for installation of piles LS 1.00
1.02 Payment and Performance Bonds Payment and Performance Bonds LS 1.00
1.03 Erosion and Sediment Control Silt curtain, biologs, silt fence, straw and native seed LS 1.00
1.04 Removals Removal of existing 30 foot x 10-inch diameter timber piles EA 5.00
1.05 Clearing the Driving Lane Removing obstructions and riprap from driving lane for new piling. Includes EA 6.00
1.06 Dock Piles New 50 foot by 13-in diameter composite piles EA 6.00
1.07 Pile Guides New guide pockets for piles EA 6.00
1.08 Floating Dock New floating dock 6.5 feet wide by 60 feet long SF 390.00
1.09 Aluminum Cleats 14" aluminum dock cleats EA 10.00
1.10 Salvage and Reinstall Salvage and Reinstall existing riprap and gangway LS 1.00
1.11 Fill Materials - Bedding Stone Sizing per 2025 FDOT Standard Specifications Section 530-2.1.4 CY 45.00
1.12 Geotextile Fabric High Strength Non-Woven Geotextile Fabric SY 225.00
1.13 Riprap Sizing per 2025 FDOT Standard Specifications Section 530-2.1.3 CY 150.00
Highlighted lines indicate mitigation items -$
RUSSELL HARBER PARK DOCK REPAIR/REPLACMENT BID FORM
NOTE: All costs are to be considered in-place costs. Include cost for all materials, hardware, shipping, fabrication, labor, equipment, insurance, bonds, permits state and local taxes, overhead and profit to properly install items listed under each system.
FLOATING DOCK WITH COMPOSITE PILING (MITIGATION)
PROJECT TOTALS
CONSTRUCTION COST TOTAL
AMI Consulting Engineers PA Confidential 4/30/2025 Page 1