Jordan School District (JSD) is seeking bids for a Make-Up-Air Replacement project at Bluffdale Elementary School located in Bluffdale, Utah. The procurement involves replacing the existing kitchen make-up air unit (MAU-1) with a new Greenheck indirect natural gas-fired unit capable of 4,400 CFM capacity, along with additional HVAC system upgrades including a Carrier rooftop unit, two Mitsubishi split air conditioning systems, new ductwork, control panels, and thermostats. Qualified...
Jordan School District (JSD) is seeking bids for a Theatrical Lighting Upgrade project at West Hills Middle School located in West Jordan, Utah. The project involves comprehensive upgrades to the school's auditorium lighting system, including the installation of new LED luminaires (ColorSource CYC, Spot V, and PAR V Zoom fixtures), an Ion Xe 2K lighting control console, architectural control systems, and related electrical infrastructure. Bidders must be licensed contractors with a minimum of...
The Jordan School District (JSD) is seeking qualified contractors to relocate the west utility transformer at Bingham High School in South Jordan, Utah. This Invitation for Bid (IFB) requires contractors to disconnect and remove existing service feeders, demolish the current transformer pad, and coordinate with Rocky Mountain Power to re-route the primary feed and install new service feeders into the main electrical switchgear. A mandatory pre-bid conference is scheduled for Wednesday, January...
Jordan School District (JSD) is seeking bids for a comprehensive elevator modernization project at South Jordan Middle School, located at 10245 South 2700 West in South Jordan, Utah. The procurement involves a turn-key modernization of one hydraulic passenger elevator with a 2,000-pound capacity, operating across two landings at 125 feet per minute. The project requires a prime contractor responsible for coordinating all trades, including electrical, mechanical, and fire/life safety contractors,...
Salt Lake County Facilities Management is soliciting bids for Project PAR127552, a comprehensive Fairmont Aquatics Center rooftop unit (RTU) replacement project located at 1044 Sugarmont Drive in Salt Lake City, Utah. The procurement involves replacing four existing air handling units with new Daikin packaged rooftop units ranging from 1,650 CFM to 6,000 CFM, including associated mechanical, electrical, and architectural work. Key deliverables include installing new RTU-1 through RTU-4,...
The Jordan School District (JSD) is soliciting bids for a Make-Up-Air Replacement project at Rose Creek Elementary School located in Riverton, Utah. The Invitation for Bid (IFB) #26DB03 seeks a qualified contractor to replace the existing make-up air system, which includes installation of a new rooftop make-up air unit (MAU-1), potential open-web truss reinforcement, and associated electrical, control, and balancing work. Bidders must submit a base bid and an alternate bid for a mini-split system in the dry storage room. The project requires a mandatory pre-bid walk-through on January 27, 2026, at 2:00 p.m. MST, with questions due by February 5, 2026, at 2:00 p.m. MST. Bid submissions are due on February 11, 2026, at 1:00 p.m. MST through the Utah Public Procurement Place (U3P) Bonfire portal. The project start date is June 8, 2026, with substantial completion required by August 7, 2026. Contractors must hold a minimum five-year licensed contractor status in Utah and comply with federal, state, and local laws, including E-Verify requirements and Utah State Energy Code.
The solicitation includes specific restrictions and requirements for bidders, including a mandatory Boycott Restriction Statement that prohibits vendors from engaging in economic boycotts against the State of Israel or specific industries. Bidders for contracts exceeding $50,000 must provide a 5% bid bond from a corporate surety licensed in Utah with an AM Best Rating of A-VIII or better. Performance and payment bonds equal to the total bid price are required for the awarded contractor. A construction allowance of $25,000 is included in the base bid, with unused funds to be returned via deductive change order. The project will be awarded to the lowest responsive and responsible bidder, with bids remaining valid for thirty days after the receipt date. The comprehensive project manual specifies detailed technical requirements, including mechanical, electrical, plumbing, and control system installations, with specific equipment like the ECON-AIR EA3-D500-24D make-up air unit and potential alternate equipment including a Mitsubishi mini-split system or Carrier rooftop unit. Contractors must provide two-year warranties on parts and service, comprehensive operation and maintenance manuals, and conduct training for district personnel.