About this opportunity
The City of Palmdale Public Works Department is requesting bids on the HSIP Cycle 11 Citywide Signal Modernization Project, with bids due October 13, 2026 at 2:00 p.m. PDT. A pre-bid meeting is scheduled for September 15, 2026 at 9:00 a.m. PDT at 38250 Sierra Highway, Palmdale, California; attendance is not required.
The scope encompasses traffic control installation; application of 2-inch reflective yellow tape to existing traffic signal head backplates; replacement of pedestrian push buttons with current standard devices; removal and reinstallation of high-visibility continental crosswalks at intersections; replacement of substandard pedestrian signal heads with modern models including countdown signals; furnishment and installation of all appurtenances; utility coordination; and striping improvements throughout Palmdale.
The award will be made on a lump sum basis to a single contractor. Bid submission is through the PlanetBids Vendor Portal in electronic format. A bid bond of 10 percent is required, along with payment and performance bonds of 100 percent each. Bid validity is 120 days from submission. Questions close September 29, 2026 at 2:00 p.m. PDT. Contact Elizabeth Johnson, City of Palmdale Public Works Department, at 661-267-5449 or purchasing@cityofpalmdaleca.gov.
Opportunity text
Provide traffic control; Install 2-inch reflective yellow tape on existing traffic signal head backplate for enhanced visibility; replace pedestrian push buttons with current standard devices; remove and reinstall high-visibility continental crosswalks at intersections; and replace identified substandard pedestrian signal heads with the latest models, including countdown signals; furnishment and installation of all appurtenances; utility coordination; and striping improvements.
Files
| File | Type | Posted |
|---|---|---|
| HSIP Cycle 11 - Citywide Signal Modernization Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity