HSIP Cycle 11 - Citywide Pedestrian Safety Improvements Project
Open State & local contract opportunity Posted
- Solicitation number
- 3027, HSIP-SL No. 5384(019)
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Elias Garcia egarcia@cityofdhs.org (760) 329-6411
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Desert Hot Springs, California is requesting bids on pedestrian and traffic signal safety improvements at seventeen signalized intersections citywide under the Highway Safety Improvement Program (HSIP) Cycle 11, with proposals due October 27, 2026.
The base bid scope includes upgrading existing traffic signal head backplates to yellow retroreflective backplates, implementing Leading Pedestrian Intervals (LPI) at specified locations, and installing high-visibility thermoplastic continental pedestrian crosswalk markings. The contract includes additive alternates for furnishing and installing activated blankout R3-1 signs; upgrading existing pedestrian push buttons to Accessible Pedestrian Signal (APS) push button assemblies with accompanying pedestrian crosswalk signs; and upgrading existing pedestrian signal indications to LED countdown pedestrian signal heads. All work must be performed in accordance with the Contract Plans, Specifications, Standard Plans, and other contract documents.
The contractor must furnish all labor, materials, equipment, tools, transportation, traffic control, testing, and incidentals necessary to complete construction. Work is performed citywide at seventeen intersections throughout Desert Hot Springs.
Opportunity text
The Project consists of furnishing all labor, materials, equipment, tools, transportation, traffic control, testing, and incidentals necessary to construct pedestrian and traffic signal safety improvements at seventeen (17) existing signalized intersections throughout the City of Desert Hot Springs. Base Bid improvements generally include upgrading existing traffic signal head backplates with yellow retroreflective backplates, implementing Leading Pedestrian Intervals (LPI), and installing high-visibility thermoplastic continental pedestrian crosswalk markings at locations shown on the Contract Plans. The Project also includes Additive Alternates for furnishing and installing activated blankout R3-1 signs; upgrading existing pedestrian push buttons to Accessible Pedestrian Signal (APS) push button assemblies, including pedestrian crosswalk signs; and upgrading existing pedestrian signal indications to LED countdown pedestrian signal heads. All work shall be performed in accordance with the Contract Plans, Specifications, Standard Plans, and other provisions of the Contract Documents.
Files
| File | Type | Posted |
|---|---|---|
| HSIP Cycle 11 - Citywide Pedestrian Safety Improvements Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity