Pierce County Planning & Public Works in Tacoma, Washington is requesting bids for guardrail improvement on Bridge #28173-D at Horn Creek under a 200-foot corridor project, with bids due October 14, 2026 at 1:00 p.m.

The scope encompasses mobilization, removal of 50 linear feet of existing guardrail, installation of drainage components, placement of crushed surfacing, erosion control and seeding, traffic control measures, and installation of beam guardrail types and protective equipment. The project includes 12 primary line items covering utility coordination, roadside cleanup, temporary traffic control, construction signage, and contingency provisions.

Bidders must submit unit prices for all line items with extensions and provide a 5% proposal guaranty in cash or certified check payable to Pierce County. Prevailing wage requirements apply. Contractors must certify non-collusion, non-segregation of facilities, wage law compliance, and debarment status. Subcontractor listings are required for structural steel, rebar, HVAC, plumbing, and electrical work per RCW 39.30.060. Contractor licensing documentation must include license number, UBI number, industrial insurance account number, excise tax number, and employment security account number.

Recycled materials are encouraged within specified limits and may serve as a tiebreaker if two or more lowest responsive bids are exactly equal. All proposals must be signed by an authorized official and notarized, with acknowledgment of any addenda received. No estimated contract value, budget range, or incumbent information is disclosed in the posting.

Opportunity text

This project provides for the improvement of Bridge #28173-D on 8th Avenue South by installing beam guardrail, transitions and terminals, and other work in accordance with and as described in the Plans and Specifications.