- The Kansas Department of Transportation is soliciting bids for grading and surfacing on South Rock Road in the City of Derby, Sedgwick County, spanning 1.69 miles from Freedom Street to 0.5 miles north of East 55th Street, with bids due electronically by 1:00 p.m. local time on September 16, 2026. Prequalified contractors must bid through Bid Express using AASHTO's Project Bids software and the project's electronic bidding system file. The scope encompasses common items including contractor...
- The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is requesting bids on surface recycling and chip seal work on K-25 in Grant County spanning 9.854 miles, with bids due September 16, 2026 at 1:00 p.m. local time through the Bid Express website and opening at 3:00 p.m. the same day. Contractors must hold current KDOT prequalification and a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award. Contractors must...
- The Kansas Department of Transportation (KDOT) is requesting bids for pedestrian and bicycle path construction on 0.87 miles of streets in Greensburg, Kiowa County, with electronic proposals due September 16, 2026 at 1:00 p.m. local time. Prequalified contractors are eligible to bid; all contractors and subcontractors must obtain current Tax Clearance Certificates from the Kansas Department of Revenue at contract award. The scope spans portions of West Florida Avenue, South Main Street, South...
- The Kansas Department of Transportation is requesting bids for surface recycle and chip seal work on K-25 in Kearny County, spanning 16.141 miles from the Grant/Kearny County line north to the south county line of Lakin, with bids due September 16, 2026 at 1:00 PM through Bid Express and opening at 3:00 PM the same day at the Eisenhower State Office Building in Topeka. This is a federal-aid highway construction project (Federal Project Number ACSTP-A804(901), State Project Number K025-047 KA...
- The Kansas Department of Transportation is requesting electronic bids for grading and bridge construction over Bazine Dry Creek in Ness County, with proposals due September 16, 2026 at 1:00 p.m. local time. Bidders must be prequalified with KDOT and must register as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date. The scope includes excavation (171 cubic yards), structural steel fabrication (6,442 pounds), precast reinforced concrete bridge slabs...
- The Kansas Department of Transportation is requesting bids on milling and hot mix asphalt overlay work on US-36 in Decatur County spanning 10.974 miles from the Rawlins/Decatur County line east to the US-36/US-83 junction under contract KA 8054-01, with proposals due September 16, 2026 at 1:00 PM local time. Bidding is restricted to prequalified contractors. Contractors must notify KDOT of intent to bid by 5:00 PM on the Monday preceding the letting date and submit electronic proposals through...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for milling and hot mix asphalt overlay work on US-36 in Cheyenne County from the Colorado/Kansas state line to Road 11, spanning 10.150 miles, with proposals due September 16, 2026 at 1:00 p.m. Local Time via Bid Express and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and must identify themselves as bid holders on KDOT's...
- The Kansas Department of Transportation is requesting sealed bids for grading, bridge, and surfacing work on the SLT/K-10 corridor in Douglas County, spanning 1.198 miles from the I-70/K-10 Junction south to 3,500 feet north of the K-10/US-40 Junction, with bids due September 16, 2026. Addendum 1, issued September 3, 2026, makes a Critical Path Method (CPM) Schedule requirement (Special Provision 15-PS0263-R2) mandatory. The contractor must designate a qualified Scheduler with a minimum of...
- The Kansas Department of Transportation (KDOT) is soliciting electronic bids for milling and hot mix asphalt overlay work on K-27 in Stanton County, spanning 12.110 miles from South US-160 Junction north to the Stanton/Hamilton County Line, with bids due September 16, 2026 at 1:00 p.m. Local Time via Bid Express. Contractors must be prequalified and submit bids electronically only; paper proposals are not accepted. A current Tax Clearance Certificate from the Kansas Department of Revenue is...
- Kansas Department of Transportation (KDOT) is soliciting electronic bids for milling and Hot Mix Asphalt overlay work on US-81 in Sumner County, spanning 10.970 miles from the US-177/US-81 junction north to 0.46 miles north of East 6th Street South, with bids due September 16, 2026 at 1:00 p.m. Local Time. Contractors must be prequalified with KDOT and must notify the department of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The scope includes milling of 4,789 tons,...
The Kansas Department of Transportation (KDOT), acting as agent for the City of Park City in Sedgwick County, is requesting bids for grading and surfacing work on 85th Street and Broadway Street in Park City under Proposal Number 526092535, with bids due September 16, 2026 at 1:00 P.M. Local Time via Bid Express. Only prequalified contractors are eligible to submit. The scope encompasses grading, excavation, compaction of earthwork, water system and storm sewer installation, and concrete and asphalt surfacing on 85th Street (300 feet west to 500 feet east of Broadway Street) and Broadway Street (300 feet south to 300 feet north of 85th Street), totaling 0.21 miles. Common items include contractor construction staking, field office and laboratory facilities, mobilization, and traffic control. The work also includes temporary erosion and sediment control, fencing, signing, and pavement marking. The project is identified as Federal Project Number STP-N081(801) and State Project Number 087 N 0818-01. Funding is federal and municipal. The contractor has 80 restricted days to open the project to unrestricted traffic and 100 total contract working days to complete all work. The earliest start date is February 1, 2027, and the latest is March 29, 2027. The contractor must execute the contract within ten business days after notice of award. Bids must include unit prices for all identified construction items. Required certifications include noncollusion and debarment certifications, financial prequalification documentation, a current Tax Clearance Certificate from the Kansas Department of Revenue (mandatory at contract award), FHWA-1273 federal-aid provisions, affirmative action and equal employment opportunity provisions, and compliance with KDOT Standard Specifications for State Road and Bridge Construction (2015 Edition). The contract is subject to restrictions on foreign unmanned aerial systems under the American Security Drone Act of 2023 and limitations on the use of federal funds for lobbying and contractual services with legislators.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Grading _ Surfacing - Park City.pdf | 1MB | 9/7/26 |