- The Kansas Department of Transportation is requesting bids on grading and bridge construction over East Fork Rattlesnake Creek in Kiowa County, with proposals due by 1:00 p.m. Local Time on August 19, 2026 through the Bid Express electronic platform. Bidders must be prequalified with KDOT and must hold a current Tax Clearance Certificate from the Kansas Department of Revenue at contract award; subcontractors must obtain Tax Clearance Certificates before approval. The project is federally...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 017 over Franks Creek and B Road (3.13 miles east of I-70/US-40B West Junction) and Bridge 019 over US-40B/K-57 at the K-57/I-70 Junction in Geary County, with proposals due August 19, 2026 at 1:00 p.m. Local Time. The scope encompasses excavation, concrete work, structural steel fabrication, bridge construction and repair, asphalt and concrete surfacing, rumble strips,...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for grading, bridge, and surfacing work on K-55 in Sumner County, with proposals due August 19, 2026 at 1:00 p.m. Local Time. The project involves construction of Bridge 117 over the Arkansas River and Bridge 118 over Antelope Creek, located 8.39 and 9.2 miles east of US-81 respectively, spanning 0.063 miles total. Scope encompasses common and road items, temporary project water control and soil erosion measures, bridge...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for pedestrian and bicycle paths construction on Main Street and Russell Avenue in the City of Wakeeney, Trego County, with proposals due August 19, 2026 at 1:00 p.m. Local Time through Bid Express; bids open at 3:00 p.m. at the Eisenhower State Office Building in Topeka. Only prequalified contractors may bid, a capability filter that eliminates unvetted competitors. The project spans 0.433 miles and includes clearing...
- Kansas Department of Transportation (KDOT) is requesting bids on a bridge replacement and grading project in Miami County (located 1.5 miles south and 1.8 miles west of New Lancaster), with proposals due August 19, 2026 at 1:00 p.m. local time via Bid Express. Contractors must be prequalified and registered as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date. The scope includes bridge replacement over Middle Creek (total project length 0.142...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 002 over Milford Lake Road in Geary County, with proposals due August 19, 2026 at 1:00 p.m. through the Bid Express website and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and notify the department of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The project...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on K-61 in McPherson County, with electronic proposals due August 19, 2026 at 1:00 P.M. Local Time via Bid Express. Prequalified contractors only are eligible to bid — this is a mandatory eligibility filter. The project covers repair and reconstruction of Bridge 100 (0.19 miles east of the K-153 Spur) and Bridge 102 (US-81 ALT, at the junction of US-81 ALT/K-61) over a project length of...
- The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is soliciting electronic bids for chip seal construction on K-27 highway in Cheyenne County, with proposals due August 19, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. the same day. The project covers 21.106 miles of K-27 from the West US36/K-27 junction north to the Kansas/Nebraska state line. Work includes mobilization, flagger services, traffic control, chip seal application, cover material (CM-L-2)...
- The Kansas Department of Transportation is requesting bids for pedestrian and bicycle paths construction in the City of Sedgwick in Harvey County, with electronic proposals due August 19, 2026 at 1:00 PM Local Time via Bid Express, and bids opening and reading at 3:00 PM the same day at the Eisenhower State Office Building in Topeka. The scope encompasses 0.08 miles of pedestrian and bicycle paths west of North Commercial Avenue from 5th Street to 6th Street, including site clearing and...
- The Kansas Department of Transportation is requesting bids for grading and surfacing pavement restoration on US-69A from 23rd Street to 20th Street in Baxter Springs, Cherokee County, with proposals due August 19, 2026 at 1:00 p.m. local time. Contractors must be prequalified and registered as bid holders by 5:00 p.m. on the Monday preceding the letting date and submit proposals electronically through Bid Express at ui.bidx.com. The scope includes clearing and grubbing, common and rock...
The Kansas Department of Transportation is requesting electronic bids for grading and bridge construction over the Pawnee River on North Ravana Road in Finney County, with proposals due August 19, 2026 at 1:00 PM Local Time and bids to be opened at 3:00 PM the same day at the Eisenhower State Office Building in Topeka. The project spans 0.090 miles and encompasses clearing and grubbing, common excavation, earthwork compaction, aggregate base installation, removal of existing structures, bridge station construction at 17+75.02 (involving class III excavation, reinforced concrete, steel reinforcing, steel piles, and slope protection), concrete work, temporary surfacing, temporary project water pollution control and soil erosion items, traffic control, field office and laboratory facilities, contractor construction staking, and flagger services. Contractors must be prequalified and maintain a current Kansas Department of Revenue Tax Clearance Certificate. The prime contractor must perform at least 30 percent of the work with its own organization. All subcontractors must maintain the same certifications and comply with applicable contract provisions. The restricted work period is 70 days; total contract duration is 90 days. The contractor must execute the contract within ten business days of award notification. The contract is funded entirely by federal sources through the Federal-Aid Highway Program (Federal Project Number BRO-C534(901), State Project Number 028 C 5349-01). Pricing follows a unit price contract format with line items for materials and labor including concrete, water, aggregate base, and flagging services, with some items featuring set prices. Contractors must comply with Davis-Bacon wage determinations, affirmative action and equal employment opportunity provisions, nondiscrimination standards, National Defense Authorization Act provisions including restrictions on foreign unmanned aerial systems and telecommunications equipment prohibitions under Section 889, Contract Work Hours and Safety Standards Act, and applicable environmental and labor standards. Electronic proposals must be submitted through the Bid Express website.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Grading _ Bridge - Finney County.pdf | 1MB | 8/16/26 |