Frisco Campus Chilled and Heating Water Loop Extension

Closed State & local contract opportunity

Solicitation number
FY2026-CSP-059
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Collin College is requesting proposals for the Frisco Campus Chilled and Heating Water Loop Extension under a Competitive Sealed Proposal process (FY2026-CSP-059), with proposals due July 28, 2026, at 3:00 p.m., a non-mandatory pre-proposal meeting on July 8, 2026, and questions due by July 14, 2026. Work is scheduled between May 17 and August 13, 2027, pending Board of Trustees approval.

The scope involves design and installation of approximately 540 linear feet of new buried hydronic piping and replacement and upsizing of approximately 370 linear feet of existing buried piping to interconnect the campus's North and East heating and chilled water spines into a unified loop. The project includes two main isolation valve junctions with surface-operated groundhog butterfly valves, permitting, utility coordination, testing and balancing, and all civil and landscape revisions. Three mechanical alternates and one landscape architecture alternate are available as optional bid items. Piping sizes range from 1.25 inches to 16 inches in diameter. The scope serves multiple buildings including the Library, LRC, Alumni Hall, Heritage Hall, IT Center, Conference Center, Building J, Dance Studio, and Music Studio at 9700 Wade Boulevard, Frisco, Texas 75035.

All work must maintain normal campus operations during business hours; planned shutdowns must occur outside business hours with at least two weeks' advance coordination. The contractor bears all costs for site restoration to original condition or better, underground utility identification, and any resulting damages. A geotechnical report identifies tan weathered limestone at depths of 8–17 feet and expansive clay soils in the upper 5–12 feet with potential vertical rise of 2–4 inches. The contractor shall submit a detailed project schedule, identify long lead items (10 weeks or more), and include costs for double shifts and seven-day work weeks if needed to meet deadlines.

Evaluation is based on price (40 points), references (15 points), ability to meet District needs (15 points), historical relationship with vendor (5 points), and relevant factors (5 points). Pricing is submitted as not-to-exceed amounts. Prevailing wage rates apply per Texas Government Code Chapter 2258. Performance and Labor and Material Payment Bonds at 100 percent of contract price are required for contracts of $100,000 or more. Workers' Compensation, Commercial General Liability ($250,000 per person / $500,000 per occurrence for bodily injury), and Business Auto Liability ($250,000 per person / $500,000 per occurrence for bodily injury) insurance is required. The District is tax-exempt; pricing must exclude all taxes.

Opportunity text

Collin College is seeking qualified proposals for the Frisco Campus Chilled and Heating Water Loop Extension.

Pending approval by the Board of Trustees, work must be completed during the course of Fiscal Year 2027.

Extreme coordination between the College and the selected contractor will be required to ensure there is no disruption to campus heating or cooling needs. A requirement of this project is that the campus remains operational during normal business hours; therefore, any planned temporary shutdowns must occur outside of normal business hours. Shutdowns must be coordinated with the college at least two weeks in advance.

Excavation will occur in various locations throughout the campus. The contractor shall bear the cost and burden of returning the site to its original condition, or better. The College will not be responsible for any underground utility damages or property damages. The contractor should perform their due diligence to identify all underground utilities or obstructions.

The contractor is expected to proactively identify and propose value engineering opportunities.

The contractor shall include cost for double shifts and/or 7 day work weeks during the project , including specifically designated shut-down windows, if needed, to complete project on time. A project schedule must be submitted with each proposal. The contractor must identify and inform the College of all long lead items (10 weeks+).