Frisco Campus Chilled and Heating Water Loop Extension
Closed State & local contract opportunity Posted
- Solicitation number
- FY2026-CSP-059
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 33055 Fencing, Temporary (For Construction And Other Industrial Or Safety Uses)
- 820 Steam And Hot Water Boilers And Steam Heating Equipment
- 89087 Water Treatment Equipment (Not Otherwise Classified)
- 90924 Building Construction, Commercial And Institutional
- 911 Construction And Utilities, Higher Education
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 91389 Maintenance And Repair, Utility/Underground Projects
- 91438 Electrical
- 91468 Plumbing
- 91484 Trade Services, Construction (Not Otherwise Classified)
Show all 11
- Point of contact
-
- Timothy Accountius taccountius@collin.edu (972) 758-3878
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
Frisco Independent School District is soliciting bids for design and construction of a chilled and heating water loop extension serving the Frisco campus facilities, with proposals due July 28, 2026. The project carries an ESBD (Economically Disadvantaged Business) set-aside.
The scope encompasses all labor, materials, equipment, and services necessary to extend the existing chilled water and heating water distribution systems to serve additional campus buildings or areas. Work must comply with the district's specifications and applicable codes and standards. Pricing will be submitted on a lump-sum or itemized basis as specified in the bidding documents.
Bidders must satisfy prequalification requirements including proof of insurance, bonding capacity, and demonstrated relevant experience with similar mechanical systems projects. Funding derives from Frisco ISD's capital improvement budget or bond proceeds.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity